09 Feb 2026

SJ Petro ZJ40 Raising Cylinder

Core Purpose & Equipment Adaptation

This document is exclusively customized for the Raising Cylinder (Model: Z07120000001AA) specially designed for the SJ Petro ZJ40 Drilling Rig. It is tailored to meet the segmented needs of drilling engineering teams, maintenance technicians, procurement personnel, and equipment managers who are responsible for the operation, maintenance, and procurement of SJ Petro ZJ40 drilling rig lifting systems. As a core hydraulic execution component of the drilling rig, the raising cylinder is mainly used to provide stable lifting power for the drilling rig’s derrick, crown block, and other key lifting components, ensuring smooth, safe, and efficient completion of derrick raising, lowering, and position adjustment during drilling operations. This document provides comprehensive guidance on product functions, structural characteristics, applicable working conditions, maintenance, and procurement, helping users avoid equipment failure risks caused by improper use, maintenance, or mismatched parts, reduce maintenance costs, and ensure the continuous and stable operation of the drilling rig.

Product Introduction

The SJ Petro ZJ40 Raising Cylinder (Z07120000001AA) is a multi-stage telescopic hydraulic cylinder independently developed and matched for the SJ Petro ZJ40 drilling rig, complying with API 6A and GB/T 15242.1-2017 standards for hydraulic cylinders in petroleum drilling equipment. It adopts a three-stage telescopic structure (including first-stage plunger, second-stage plunger, and third-stage piston) to achieve long-stroke lifting with compact overall dimensions, which is perfectly adapted to the limited installation space of the SJ Petro ZJ40 drilling rig. The cylinder is made of high-strength alloy steel and precision-processed components, with excellent pressure resistance, wear resistance, and corrosion resistance, capable of withstanding the harsh working environment of petroleum drilling and long-term high-load operation. All matching components (including cylinder body, turnbuckle, copper sleeve, sealing rings, etc.) are specially customized to ensure perfect compatibility with the main cylinder, avoiding leakage, jamming, and other faults caused by mismatched parts.

Function Description

The core function of the SJ Petro ZJ40 Raising Cylinder (Z07120000001AA) is to convert hydraulic energy into mechanical energy, providing stable, controllable lifting and lowering power for the key components of the SJ Petro ZJ40 drilling rig. Specifically, its functions include: first, derrick raising and lowering: providing sufficient lifting force to smoothly raise the derrick from the horizontal position to the vertical working position, and safely lower it to the horizontal position during equipment shutdown or maintenance; second, position adjustment: realizing fine adjustment of the derrick’s height and position through stepless speed regulation, ensuring the derrick is vertical and stable, meeting the drilling operation requirements; third, load bearing and pressure maintaining: after the derrick is raised in place, it can stably bear the weight of the derrick and related components, and maintain the working pressure through the built-in check valve, preventing accidental lowering due to hydraulic oil leakage; fourth, shock absorption and buffering: the built-in guiding rings, wear rings, and sealing components can effectively absorb the vibration generated during drilling operations, reducing the impact on the cylinder body and related components, extending the service life of the equipment; fifth, fault self-protection: the air exhaust plug can discharge the air in the cylinder to avoid air resistance, jamming, and other faults during operation, ensuring the cylinder operates smoothly.

Structural Characteristics

The SJ Petro ZJ40 Raising Cylinder (Z07120000001AA) adopts a scientific and reasonable structural design, combining compactness, durability, and maintainability, with the following key structural characteristics: 1. Multi-stage telescopic structure: It adopts a three-stage telescopic design (first-stage plunger, second-stage plunger, third-stage piston), which effectively reduces the overall length of the cylinder when retracted, saving installation space, and can achieve a long lifting stroke when extended, meeting the derrick lifting requirements of the SJ Petro ZJ40 drilling rig; 2. High-strength cylinder body and plunger: The cylinder body (Z07120400002AA) and plungers are made of 45# high-strength alloy steel,经过 precision forging, heat treatment, and honing, with high surface finish and hardness, capable of withstanding high hydraulic pressure (rated pressure ≥ 25MPa) and long-term load-bearing; 3. Precision guiding and wear-resistant structure: Equipped with multiple guiding rings (P1100303AA, P1100305AA, etc.) and wear rings (P1100304AA), which can ensure the concentricity of the plunger/piston during telescopic movement, reduce friction between components, and avoid jamming and wear; 4. Reliable sealing system: Adopting V-type rings (P1100301AA, P1100302AA), O-rings (5300100043, 5300100170, etc.), dust rings (P1100323AA, P1100327AA), and other multi-layer sealing components, with excellent sealing performance, preventing hydraulic oil leakage and external dust, impurities from entering the cylinder, ensuring the cylinder operates stably; 5. Easy maintenance structure: The cylinder cover (P2300019AA), rod head (P1100297AA), and other components adopt bolted connection, which is easy to disassemble and assemble; the air exhaust plug (P1100332AA) and grease nipple (4314510070) are reasonably arranged, facilitating air exhaust, lubrication, and daily inspection; 6. Anti-corrosion and protective structure: The cylinder body surface is treated with anti-corrosion coating, and the matching guard (Z07120500001AA) can effectively protect the cylinder from collision, wear, and corrosion caused by drilling tools, debris, and harsh outdoor environments.

Applicable Working Conditions

The SJ Petro ZJ40 Raising Cylinder (Z07120000001AA) is specially designed for the working environment of the SJ Petro ZJ40 drilling rig, with strong environmental adaptability, and is applicable to the following working conditions: 1. Petroleum drilling sites: It is suitable for onshore petroleum drilling sites, including desert, grassland, mountain, and plain areas, capable of withstanding extreme temperature changes (-40℃ ~ +80℃); 2. High-load working conditions: It can stably bear the weight of the derrick and related components (rated load ≥ 500kN), and work continuously under high hydraulic pressure, meeting the long-term drilling operation requirements; 3. Harsh environmental conditions: It has excellent dustproof, waterproof, and corrosion-resistant performance, capable of working normally under conditions of sandstorm, rain, dew, and high humidity, avoiding faults caused by environmental factors; 4. Frequent start-stop working conditions: It can adapt to the frequent start-stop and telescopic movement during derrick adjustment and drilling operation, with stable performance and no jamming or leakage; 5. Mobile drilling conditions: It is perfectly adapted to the mobile working characteristics of the SJ Petro ZJ40 drilling rig, and can maintain stable performance during equipment transportation and site transfer, avoiding damage caused by vibration.

Maintenance and Maintenance Suggestions

To extend the service life of the SJ Petro ZJ40 Raising Cylinder (Z07120000001AA), reduce failure rate, and ensure safe and stable operation, the following maintenance and maintenance suggestions are proposed, which should be strictly implemented by maintenance technicians: 1. Daily inspection: Before each drilling operation, check the cylinder body surface for scratches, corrosion, and oil leakage; check the connection parts (bolt, pinshaft, turnbuckle) for looseness; check the air exhaust plug for air leakage; check the dust ring for damage and dust accumulation, and clean or replace it in time; 2. Regular lubrication: Inject lubricating grease into the grease nipple (M10X1) every 3 working days to ensure the lubrication of the guiding rings, wear rings, and copper sleeves, reducing friction; 3. Hydraulic oil maintenance: Use hydraulic oil that meets the standard (recommended No. 46 anti-wear hydraulic oil), and replace the hydraulic oil every 6 months; regularly check the hydraulic oil for contamination (impurities, moisture), and filter or replace it in time to avoid internal corrosion and wear of the cylinder; 4. Sealing component maintenance: Check the sealing rings (V-type ring, O-ring, dust ring) every 1 month for aging, cracking, and deformation, and replace them in time if any damage is found; when replacing, use the original matching sealing components to avoid leakage caused by mismatching; 5. Disassembly and maintenance: When the cylinder has faults such as jamming, severe leakage, and insufficient lifting force, disassemble it for inspection; pay attention to protecting the plunger and piston surface during disassembly, avoid scratches; clean the cylinder body, copper sleeve, and other components, and replace the worn parts (copper sleeve, guiding ring, wear ring) in time; 6. Storage maintenance: When the drilling rig is shut down for a long time (more than 1 month), retract the cylinder to the shortest position, apply anti-rust oil to the cylinder body and plunger surface, cover the guard, and store it in a dry, ventilated place to avoid corrosion; 7. Regular inspection of key components: Check the cylinder body, plunger, and piston for fatigue cracks every 12 months; check the check valve seat and steel ball for wear and leakage, and replace them in time if any damage is found.

Z07120000001AA

Raising cylinder

Z07120400002AA

Cylinder body

Z07120300004AA

1st stage plunger

Z07120300005AA

2nd stage plunger

Z07120300006AA

3rd stage piston

P1100294AA

Turnbuckle

P1100326AA

Press ring

P1100295AA

Copper sleeve

P1200192AA

Nut

P1300165AA

Turnbuckle

P1100322AA

Press ring

P1100296AA

Copper sleeve

P1200193AA

Nut

P1200194AA

Nut

P0100117AA

Cylinder cover

P2300019AA

Rod head

P1100297AA

Retaining ring

P1100298AA

Retaining ring

P1100657AA

Supporting ring

P1100299AA

Retaining ring

P1100300AA

Dust ring

P1100323AA

V type ring

P1100301AA

Dust ring

P1100327AA

V type ring

P1100302AA

Guiding ring

P1100303AA

Wear ring

P1100304AA

Guiding ring

P1100305AA

Guiding ring

P9000051AA

Spring

P6201007AA

Spring seat

P1300192AA

Check valve seat

P1100293AA

Copper sleeve

P1100331AA

Press nut

Z07120200001AA

Air exhaust plug

P1100332AA

Dust ring

P2000927AA

Pinshaft

4101800008

Grease nipple M10X1

4314510070

Cotter pin 10X70

4500200017

Steel ball 19

QBJ120102

Z1/4 plug

QBJ10010804

Z1X1/2 bushing

QBJ120104

Z1/2 plug

4306808010

Allen set screw M8X10

QBJ120103

Z3/8 plug

 

5300100043

O ring 15X2.65

5300100170

O ring 58X3.55

5300100528

O ring 175X5.3

5300100519

O ring 165X7

Z07120500001AA

Guard, raising cylinder

P6009755AA

Press plate, pin shaft

4301312035

Bolt M12X35

4313000012

Spring washer 12

P1700331AA

V type sealing ring

P1100658AA

Press ring

P1100330AA

Supporting ring

P1100325AA

Supporting ring

 

On-site Fault Maintenance Cases

The following are 4 real on-site fault maintenance cases of the SJ Petro ZJ40 Raising Cylinder (Z07120000001AA), which can provide reference for maintenance technicians to quickly troubleshoot and solve faults:

Case 1: Cylinder Leakage Fault

Fault Phenomenon: During the derrick raising process of the SJ Petro ZJ40 drilling rig, hydraulic oil leakage was found at the connection between the cylinder cover and the cylinder body, and the lifting speed was significantly slowed down. Fault Cause: After inspection, the V-type ring (P1100301AA) at the cylinder cover was aged and cracked, and the press ring (P1100295AA) was loose, leading to poor sealing and oil leakage. Maintenance Method: Stop the equipment immediately, release the hydraulic pressure in the cylinder, disassemble the cylinder cover, replace the aged V-type ring with the original matching one (P1100301AA), tighten the press ring to the specified torque, and inject hydraulic oil to test the operation. Fault Elimination: After maintenance, the oil leakage fault was eliminated, and the cylinder lifting speed returned to normal, which could stably complete the derrick raising operation.

Case 2: Cylinder Jamming Fault

Fault Phenomenon: When the raising cylinder was extended, it was stuck and could not move smoothly, and abnormal noise was generated. After forced operation, the plunger surface was scratched. Fault Cause: After disassembly and inspection, the copper sleeve (P1200192AA) was severely worn, leading to the loss of guiding function of the plunger; at the same time, there was a lot of dust and impurities in the cylinder, which increased the friction between the plunger and the cylinder body. Maintenance Method: Replace the worn copper sleeve with the original matching one (P1200192AA), clean the cylinder body, plunger, and other components with clean hydraulic oil, install the guiding ring and wear ring again, inject lubricating grease into the grease nipple, and test the operation. Fault Elimination: The cylinder could extend and retract smoothly without jamming or abnormal noise, and the plunger surface was protected from further damage.

Case 3: Insufficient Lifting Force Fault

Fault Phenomenon: The raising cylinder could not raise the derrick to the specified position, and the lifting force was obviously insufficient, accompanied by slight oil leakage at the piston. Fault Cause: Inspection found that the check valve seat (P1100293AA) was worn, leading to poor pressure maintaining performance of the check valve; the O-ring (5300100528) on the third-stage piston was damaged, causing internal leakage of hydraulic oil, and the effective pressure in the cylinder was reduced. Maintenance Method: Replace the worn check valve seat (P1100293AA) and damaged O-ring (5300100528) with original parts, clean the check valve and piston, reassemble and test the pressure. Fault Elimination: The cylinder’s pressure maintaining performance was restored, the lifting force reached the rated value, and the derrick could be smoothly raised to the specified position without internal leakage.

Case 4: Plunger Damage Fault

Fault Phenomenon: After the drilling rig was transferred to the site, the raising cylinder was found to have abnormal vibration during operation, and the plunger surface had obvious scratches and corrosion. Fault Cause: During transportation, the guard (Z07120500001AA) was damaged, and the plunger was collided by debris; at the same time, the plunger surface was not coated with anti-rust oil during storage, leading to corrosion. Maintenance Method: Replace the damaged guard (Z07120500001AA), polish the scratches on the plunger surface with fine sandpaper, apply anti-rust oil, check the guiding ring and wear ring for wear, and replace them if necessary. Fault Elimination: The cylinder vibration was eliminated, the plunger corrosion was controlled, and the cylinder could operate stably for a long time.

FAQ (Frequently Asked Questions)

No.

Questions

Answers

1

What is the compatibility of the SJ Petro ZJ40 Raising Cylinder (Z07120000001AA) with the SJ Petro ZJ40 drilling rig? Can it be replaced with other models of raising cylinders?

The SJ Petro ZJ40 Raising Cylinder (Z07120000001AA) is specially customized and matched for the SJ Petro ZJ40 drilling rig. All dimensions, pressure parameters, and matching components are completely consistent with the drilling rig’s design requirements, ensuring 100% compatibility. It is not recommended to replace it with other models of raising cylinders, because mismatched cylinder dimensions, pressure ratings, and connection methods will lead to installation failure, oil leakage, jamming, and even damage to the drilling rig’s derrick and other components, posing safety risks.

2

What are the common faults of the raising cylinder, and how to quickly judge the fault cause on site?

The common faults of the SJ Petro ZJ40 Raising Cylinder include oil leakage, jamming, insufficient lifting force, abnormal noise, and plunger damage. Quick judgment method: ① Oil leakage: Check the sealing components (V-type ring, O-ring, dust ring) for aging and damage, and the connection parts for looseness; ② Jamming: Check the copper sleeve, guiding ring, and wear ring for wear, and the cylinder for dust and impurities; ③ Insufficient lifting force: Check the hydraulic oil pressure, check valve for pressure maintaining performance, and piston for internal leakage; ④ Abnormal noise: Check the lubrication of components, and the plunger/piston for eccentricity or scratch; ⑤ Plunger damage: Check the guard for damage, and the plunger surface for collision and corrosion.

3

What type of hydraulic oil and lubricating grease should be used for the raising cylinder, and what are the replacement cycles?

Recommended hydraulic oil: No. 46 anti-wear hydraulic oil, which meets the GB/T 11118.1-2011 standard, with good anti-wear, anti-oxidation, and anti-rust performance; replacement cycle: every 6 months or 1000 working hours. Recommended lubricating grease: Lithium-based grease (No. 2), which meets the GB/T 7324-2010 standard; lubrication cycle: inject lubricating grease into the grease nipple every 3 working days, and fully lubricate the components during disassembly and maintenance.

4

How to store the raising cylinder when the drilling rig is shut down for a long time, and what points should be paid attention to?

When the drilling rig is shut down for a long time (more than 1 month), the raising cylinder should be stored as follows: ① Retract the cylinder to the shortest position to reduce the exposed area of the plunger; ② Release the hydraulic pressure in the cylinder to avoid long-term pressure on the sealing components; ③ Clean the cylinder body and plunger surface, and apply a thin layer of anti-rust oil to prevent corrosion; ④ Check and tighten all connection parts, cover the guard to avoid collision and dust accumulation; ⑤ Store the drilling rig in a dry, ventilated, and shaded place, avoid direct sunlight and rain, and prevent the cylinder from being damaged by extreme temperatures.

5

When replacing the components of the raising cylinder (such as sealing rings, copper sleeves, plungers), what standards should be followed to ensure the maintenance effect?

When replacing the components of the raising cylinder, the following standards must be followed: ① Use original matching components (the model and specification must be consistent with the original parts, such as the V-type ring P1100301AA, copper sleeve P1200192AA), to avoid mismatching caused by non-original parts; ② The replacement components must meet the relevant standards (API 6A, GB/T 15242.1-2017), with qualified material, precision, and performance; ③ Strictly follow the disassembly and assembly procedures, avoid scratching the cylinder body, plunger, and other precision components during operation; ④ After replacement, conduct pressure test and trial operation to ensure that the cylinder has no oil leakage, jamming, and other faults, and the lifting force and speed meet the requirements.

Procurement Guide

The SJ Petro ZJ40 Raising Cylinder (Z07120000001AA) and all its matching components are core parts that affect the safe and stable operation of the SJ Petro ZJ40 drilling rig. To ensure the operation efficiency of the drilling rig and avoid safety risks and economic losses caused by inferior parts, we recommend that you purchase products that meet the original factory standards. All products introduced in this document are made of high-quality materials, processed with precision, and fully comply with API 6A and GB/T 15242.1-2017 standards, with perfect compatibility with the SJ Petro ZJ40 drilling rig. Whether you need to purchase the whole raising cylinder, replace wearing parts (sealing rings, copper sleeves, guiding rings), or reserve spare parts for daily maintenance, we can provide comprehensive support and professional technical guidance. We strictly control the product quality, ensure that each product has passed strict pressure test and quality inspection before leaving the factory, and provide detailed product specifications and maintenance guidance. Please select the required products according to the part name and model, and contact us for procurement. We are committed to providing you with high-quality products, reasonable prices, and thoughtful services, helping you reduce maintenance costs, extend equipment service life, and ensure the continuous and efficient operation of your drilling rig.

 

contact us 

Emeil: [email protected]   whatsapp: +86 15275658619

Should you have any purchase intentions, please contact us – we will offer you our most favorable price.


Prosperity Petroleum Equipment

Quick Inquiry