22 Feb 2026

PISTON 012180493 VT1015-62L| Drilling pump

Introduction

This document focuses on a full range of specialized spare parts tailored for drilling rigs and their core components, including mud pumps (such as F-1300 mud pump, PZ-7 valve system), power tongs (XQ140/12A model), gate valves, butterfly valves, and transmission systems. Our product lineup precisely matches key equipment models, covering SDPROSPERITY drilling pumps, SOUTHWESTERN drilling components, DEMCO/USA valves, ODRILL gate valves, and GATES mud rotary hoses, directly addressing the segmented needs of oilfield operation teams, drilling rig maintenance departments, and spare parts procurement professionals.

The core purpose of these spare parts is to ensure the stable and efficient operation of drilling equipment, minimize unplanned downtime caused by component failure, reduce maintenance costs, and extend the service life of key drilling systems. In the harsh and high-intensity oilfield environment, drilling teams often face painful challenges: incompatible spare parts leading to installation delays, low-quality replacements causing frequent failures, lack of professional technical guidance for on-site maintenance, and difficulty confirming the right parts for specific equipment models. Our spare parts solve these pain points by adhering to international industry standards (API, GB), matching OEM specifications, and providing comprehensive technical support, ensuring each part is reliable, compatible, and durable.

We prioritize quality and authenticity, with each spare part undergoing strict quality inspection to meet the rigorous requirements of on-site drilling operations—whether for emergency replacement to resolve sudden failures or regular maintenance to prevent equipment breakdowns. Our supply system covers all key categories in the provided list, and our professional technical guidance serves as a practical reference for both procurement and maintenance, helping you make informed purchasing decisions and efficiently resolve on-site technical issues.

Product Overview

Our drilling rig spare parts cover all critical functional systems of drilling equipment, including transmission systems, valve control systems, mud circulation systems, power tong systems, and sealing systems. The core products include transmission components (spacers, idle gear shafts, spindles, roller shafts, duplex gears), mud pump components (pistons, cylinder sleeves, cylinder covers, valve inserts, valve springs), valve parts (gate valves, butterfly valves, combination valve cores), power tong parts (tong dies, backup tong reset knob shafts), sealing elements (O-rings, seal plugs, wiper seals), and auxiliary components (expansion joints, mud rotary hoses, puller heads). All parts comply with international standards such as API 7, GB3452.1-82, and match the specifications of well-known manufacturers to ensure full compatibility and reliable performance.

Core Product Categories & Key Specifications

1. Transmission System Components

Transmission components are the "backbone" of drilling rig power transmission, responsible for transferring power smoothly and stably. Our product range includes XYQ12.Z-07 spacer rings, XYQ12.Z-53 idle gear shafts, XYQ12.Z-10/28 spindles, XYQ3C.Z.6-4 roller shafts, XYQ3C.Z.6-3 rollers, and XYQ6B.B-8 duplex gears. These parts are made of high-strength alloy steel, processed through precision machining and heat treatment to enhance wear resistance, fatigue strength, and impact resistance, ensuring stable operation under high-load and high-vibration drilling conditions.

2. Mud Pump Components

Mud pumps are critical for maintaining normal mud circulation in drilling operations, and their components directly affect operational stability. Our mud pump spare parts include PISTON 012180493 VT1015-62L (6-1/4’’), XYQ3C.B-23B piston, XYQ12.B-13C cylinder sleeve, PUMP CYLINDER COVER 36001-05.17, VALVE INSERT SWND-7I, and VALVE SPRINGS 5710-115L for PZ-7 full open valves. These components are designed to resist corrosion, erosion, and high pressure—pistons and cylinder sleeves use wear-resistant materials, valve inserts adopt high-hardness alloys, and valve springs are made of high-elasticity steel to ensure long service life in high-solids mud environments.

3. Valve Parts

Valves control the flow of mud, oil, and other media in drilling systems, requiring high sealing performance and pressure resistance. Our valve products include 2’’ GATE VALVE (5000PSI, DEMCO/DRILLMAX P/N 203102522110), 4’’ GATE VALVE (5000#, ODRILL P/N J007420-2522110), 10’’ VLV BUTTERFLY (DEMCO/USA P/N J022126-5115311), and FULL OPEN VALVE WITH INSERT API-7 (SWND-7V1). These valves feature ductile iron or cast iron bodies, 416SS stems, nickel-plated discs, and BUNA-N seats, complying with API standards and ensuring reliable sealing under pressures up to 5000PSI.

4. Power Tong & Auxiliary Components

Power tongs (XQ140/12A model) and auxiliary components ensure efficient and safe drilling operations. Our product range includes XYQ12A tong dies (73-78MM), 12-1209 tong dies (60-78MM), XYQ12.B-02A backup tong reset knob shafts, 18-3050 tubing stripper rubber (2″7/8 JU-25), GATES mud rotary hoses (3-1/2″ ID, 5000 PSI WP), 6” expansion joints (MCMASTER-CARR P/N 9175K19), and various sealing elements (O-rings 160X7, 125X7, 95X5.3, GB3452.1-82). All auxiliary parts are designed to match the original equipment, ensuring easy installation and reliable performance, while sealing elements use high-quality elastomers to resist high temperature, oil, and chemical corrosion.

Functional Features

1. Perfect Compatibility

All spare parts are strictly designed and manufactured according to OEM specifications and equipment models, including SDPROSPERITY drilling pumps, SOUTHWESTERN components, DEMCO/USA valves, ODRILL gate valves, GATES hoses, and XQ140/12A power tongs. Each part’s dimensions, materials, and performance parameters fully match the original equipment, allowing direct installation without modification—eliminating the risk of equipment damage caused by incompatible parts and saving installation time for maintenance teams.

2. Exceptional Durability & Reliability

We select high-quality raw materials and adopt advanced manufacturing processes to ensure each part can withstand harsh oilfield conditions. Transmission components undergo precision forging and heat treatment to enhance wear resistance; mud pump parts use corrosion-resistant and wear-resistant alloys to extend service life; valve parts adopt high-strength bodies and high-performance seals to ensure pressure resistance and sealing performance; sealing elements use high-quality elastomers to avoid aging and leakage. All parts pass strict quality inspections before leaving the factory, meeting the high standards of long-term continuous drilling operations.

3. Easy Installation & Maintenance

All spare parts are designed with on-site maintenance needs in mind, featuring simple and reasonable structures that can be installed and replaced quickly using standard tools. For example, tong dies and O-rings can be replaced in minutes, while transmission components and valve parts are marked with clear specifications for easy identification. We also provide detailed installation guidelines to help maintenance teams complete replacement and maintenance efficiently, reducing equipment downtime.

4. Compliance with International Standards

Our spare parts strictly comply with international industry standards and specifications, including API (American Petroleum Institute) standards (API 7 for drilling equipment components), GB (Chinese National Standard) GB3452.1-82 for O-rings, and relevant ISO standards. This compliance ensures that our parts meet the safety, performance, and quality requirements of global oilfield operations, making them suitable for both domestic and international drilling projects.

Structural Characteristics

1. Transmission System Components

Transmission components adopt a precision-machined integral or split structure according to their functional requirements. Spindles (XYQ12.Z-10/28, XYQ6B.B-7) feature a smooth surface and precise thread design for stable power transmission and reliable connection; roller shafts (XYQ3C.Z.6-4) and rollers (XYQ3C.Z.6-3) have a wear-resistant surface and reasonable clearance design to reduce friction and heat generation during operation; duplex gears (XYQ6B.B-8) adopt a high-precision tooth profile design to ensure smooth meshing and low noise, enhancing transmission efficiency.

2. Mud Pump Components

Pistons (012180493 VT1015-62L, XYQ3C.B-23B) adopt a dual-seal structure to ensure tight sealing and prevent mud leakage; cylinder sleeves (XYQ12.B-13C) have a wear-resistant inner surface and a precise fit with the cylinder body to reduce wear and extend service life; cylinder covers (36001-05.17) are designed with a reinforced structure to withstand high pressure, and the sealing surface is precision-machined to ensure good sealing performance. Valve inserts (SWND-7I) and valve springs (5710-115L) are designed to match the PZ-7 valve system, ensuring flexible opening and closing and reliable sealing.

3. Valve Parts

Gate valves (2’’, 4’’) adopt a full-port weld-on design with a heavy-duty structure to withstand high pressure (up to 5000PSI), and the valve core is designed for smooth operation to ensure unobstructed media flow. Butterfly valves (10’’, 6’’) feature a lug or wafer type design for easy installation and disassembly; the ductile iron body has good impact resistance, the 416SS stem is corrosion-resistant and wear-resistant, and the BUNA-N seat ensures reliable sealing. Full open valves (SWND-7V1) adopt an API-7 standard design with a removable insert for easy maintenance and replacement.

4. Sealing & Auxiliary Components

O-rings (160X7, 125X7, 95X5.3) adopt a circular cross-section design with precise dimensional control to ensure tight sealing under high pressure; they are made of high-quality elastomers to adapt to different temperature and pressure environments. Mud rotary hoses (GATES) feature a durable rubber layer and reinforced structure to withstand high pressure (5000 PSI WP) and abrasion, with 4’’ API male threads at both ends for easy connection. Expansion joints (6”) have easy-align galvanized steel flanged ends and a single arch design to absorb pipeline displacement and vibration, protecting the pipeline system.

Applicable Working Conditions

Our drilling rig spare parts are specially developed to adapt to the harsh and complex working environments of oilfield drilling, suitable for the following scenarios:

 Onshore Oilfield Drilling: Adapt to dry, dusty, high-temperature, and low-temperature environments (temperature range: -40℃ to 85℃), suitable for conventional oil and gas drilling, shale gas drilling, and coalbed methane drilling, with strong resistance to dust and vibration.

 High-Pressure Drilling Operations: Bear high working pressure (up to 5000PSI, 35MPa), suitable for deep well drilling, ultra-deep well drilling, and high-pressure mud circulation systems, ensuring no leakage or failure under high pressure.

 Heavy-Duty Continuous Operations: Designed for 24/7 continuous drilling operations, with high durability and reliability, reducing the frequency of part replacement and equipment downtime, and improving overall drilling efficiency.

 Corrosive & Abrasive Environments: Resist corrosion from acidic, alkaline, and high-salinity mud, and abrasion from high-solids mud, suitable for drilling in coastal, saline-alkali, and other corrosive areas, extending the service life of components.

Maintenance & Care Recommendations

Proper maintenance and care of drilling rig spare parts are crucial to extending their service life, reducing maintenance costs, and ensuring the stable operation of drilling equipment. Based on years of on-site operation experience, we provide the following practical maintenance recommendations:

1. Storage Guidelines

Store spare parts in a clean, dry, and well-ventilated warehouse, avoiding direct sunlight, rain, and humidity. Transmission components, valves, and precision parts should be stored in sealed packaging to prevent dust and moisture contamination; metal parts should be coated with anti-rust oil every 3 months to avoid rust. Spare parts should be classified and placed on shelves according to their categories and specifications, with clear labels for easy identification and retrieval. Avoid stacking heavy objects on vulnerable parts (such as O-rings, wiper seals) to prevent deformation.

2. Installation Precautions

Before installation, thoroughly clean the installation position of the equipment and the surface of the spare part to remove dust, oil, and debris—this prevents scratches and damage to the part during installation. For transmission components and bearings, apply an appropriate amount of lubricating grease (matching the working temperature and load) to reduce friction and heat generation. For sealing elements (O-rings, seal plugs), check for damage, deformation, or aging before installation; replace them immediately if any defects are found. Follow the equipment installation manual to ensure correct installation and torque adjustment, avoiding improper installation that may cause equipment failure.

3. Regular Inspection & Replacement

During drilling operations, conduct regular inspections of key spare parts: inspect high-wear parts (pistons, cylinder sleeves, tong dies, O-rings) daily; inspect transmission components, valves, and hoses weekly. Check for signs of wear, corrosion, leakage, or deformation, and record the operation status. Replace worn or damaged parts in a timely manner according to the manufacturer’s recommended service life—for example, replace O-rings every 6 months or when aging is found; replace pistons and cylinder sleeves when wear exceeds 1mm. For emergency replacement parts, conduct a pre-installation inspection to ensure compatibility and quality.

4. Lubrication & Protection

Regularly lubricate rotating components (spindles, roller shafts, gear shafts) with appropriate lubricating oil or grease, following the manufacturer’s recommendations for lubricant type and lubrication cycle. In dusty or high-temperature environments, increase the lubrication frequency and use high-temperature, dust-proof lubricants. For equipment operating in corrosive environments, clean the surface of spare parts regularly and apply anti-corrosion coatings to extend their service life. For mud rotary hoses and expansion joints, avoid excessive bending and impact to prevent damage.

We supply the following spare parts:

XYQ12.Z-07 Spacer ring

XYQ12.Z-53 Idle gear shaft

XYQ12.Z-10 Spindle

XYQ12.Z-28 Spindle

XYQ3C.Z.6-4 Roller shaft

XYQ3C.Z.6-3 Roller

XYQ3C.Z.6-5 Roller support seat

XYQ3C.Z.6-6 Flat Key

XYQ6B.B-7 Spindle

XYQ6B.B-8 Duplex gear

XYQ12.B-02A Backup tong reset knob shaft

XYQ12.B-13C Cylinder sleeve

XYQ3C.B-23B Piston

XYQ3C.B-25 Support ring

XYQ12.B-16C Rack plunger

XYQ3C.Z.5.1 Combination valve core

XYQ3C.Z.5-4 Spring

XQ140/12A Power tong model

18-3050 TUBING STRIPPER RUBBER (2″7/8 JU-25; JU TYPE)

XYQ12A TONG DIES (73-78MM)

12-1209 TONG DIES 60-78MM

12-1205 TONG DIES (89-114MM)

GATE VALVE, 2″, SERIES DM, 5000PSI, WP: 4 BOLT, DESIGN: 2″ (50MM), FULL PORT WELD ON SCHED XXS; PART NUMBER: ; N/A, MANUFACTURER: DEMCO OR DRILLMAX 2″ GATE VALVES, 5000 PSI B/W XXH W/STD TRIM P/N 203102522110

PUMP CYLINDER COVER; PART NUMBER: 36001-05.17

VALVE INSERT; PART NUMBER: SWND-7I; MANUFACTURER: SOUTHWESTERN DRILLING

VALVE FULL OPEN WITH INSERT API-7; PART NUMBER: SWND-7V1; MANUFACTURER: SOUTHWESTERN DRILLING

PULLER HEAD API-7 SWND-7PH

MNF: GATES, RUBBER ROTARY HOSE (MUD ROTARY HOSE), 5,000 PSI WP, 10,000 PSI TP GRADE D WITH 4″ API MALE THREADS EACH END, 3-1/2″ ID X 60FT

PONY ROD SEAL (INTERMEDIATE ROD) “O” RING 160 X 7; PART NUMBER: GB3452.1-82 160X7

PISTON 6-1/4’’; PN: 012180493 VT1015-62L

VALVE SPRINGS F/FULL OPEN VALVES FOR PZ-7; PART NUMBER: 5710-115L

SEAL PLUG, CYLINDER HEAD, FOR MUD PUMP F-1300; MATERIAL: URETHANE

PULLER HEAD (FOR FULL OPEN SEAT), P/N H-40SN

CYLINDER HEAD PLUG; PART NUMBER: 36001-05A.06.00

PREMIERE PLUG; FOR PREMIER VALVE STANDARD SERVICE; SIZE: 2″ 10000 PSI; WP END CONNECTION MALE X FEMALE HAMMER LUG UNION END STANDARD SERVICE FIG 1502; PART NUMBER: A14778

PONY ROD SEAL (INTERMEDIATE ROD) “O” RING 125 X 7; PART NUMBER: GB3452.1-82 125X7

SEAT, 8″ BUTTERFLY VALVE BUNA N, NE-C/NE-I, DEMCO/USA P/N J001798-031

O-RING; DIMENSION: 95 X 5.3; PART NUMBER: GB3452.1-82; MANUFACTURER: NANYANG PETROLEUM CO., LTD.

HOSE MUD ROTARY 3-1/2″ ID X 20 FEET, 5000 PSI WP / 10,000 PSI TEST, GRADE D THREADED BOTH ENDS 4″ MALE PIPE E/E, MNF: GATES (WT: 588 LBS EA)

GATE VALVE, 4″, 5000#, MUD GATE VALVE, MCM, ODRILL; PART NUMBER: J007420-2522110

6” EXPANSION JOINTS WITH EASY-ALIGN GALVANIZED STEEL FLANGED ENDS (SINGLE ARCH, UNTHREADED BOLT HOLES, NEOPRENE), MFG – MCMASTER-CARR P/N 9175K19

6″ VALVE BUTTERFLY 150# WAFFER TYPE 200 PSI, CI BODY SS DISK WITH 2-OFF SLIP-ON FLANGES & C/W 8 STUD DEMCO/USA

BONNET BOLT; PART NUMBER: 11148.04

O-RING FOR BONNETS P/N 11148.41.02

HIGH PRESSURE VALVE 4” X 35MPA FIG 1003 FOR HIGH PRESSURE MANIFOLD ZG102-35

WIPER: BLACK RUBBER 5″ DRILL PIPE SIZE X 19″ OD SINGLE

SEAL TOP; PART NUMBER: 11148.09.01.01

COVER CYLINDER; PART NUMBER: 36001-05.14A

FULL OPEN VALVE WITH URETHANE INSERT P/N 9700353 OR P/N SWND-6V1

VLV BUTTERFLY 10″; LUG; NE-C; 200 PSI; DUCTILE IRON BODY; 416SS STEM; NICKEL PLTD. DUCT. IRON DISC; BUNA-N SEAT; 10 POS. HDL.; WEIGH T 72.40 LBS; DEMCO/USA; PART NUMBER: J022126-5115311

On-Site Fault Maintenance Cases

Case 1: Mud Pump Piston Leakage & Efficiency Drop

Fault Phenomenon: During onshore drilling, the SDPROSPERITY drilling pump equipped with PISTON 012180493 VT1015-62L experienced severe mud leakage at the piston end, and the pump efficiency dropped by 20%, affecting drilling progress. Reason Analysis: After disassembly, it was found that the piston seal was worn and the piston surface had scratches, leading to poor sealing and mud leakage. Solution: Replace the worn piston with a new PISTON 012180493 VT1015-62L, clean the cylinder sleeve, and check the cylinder inner surface for scratches. After installation and test run, the mud pump leakage disappeared, and the efficiency returned to normal, ensuring continuous drilling operation. Key Takeaway: Regularly inspect piston wear and replace it in time to avoid reduced pump efficiency and increased maintenance costs.

Case 2: Gate Valve Sealing Failure & Pressure Loss

Fault Phenomenon: The 4’’ ODRILL gate valve (P/N J007420-2522110) in the mud circulation system had media leakage when closed, and the system pressure dropped by 15%, unable to maintain normal drilling pressure. Reason Analysis: The valve core was worn due to long-term contact with high-solids mud, and the valve seat was damaged, leading to poor sealing.Solution: Replace the worn gate valve with a new 4’’ ODRILL gate valve (P/N J007420-2522110), adjust the valve opening and closing torque, and conduct a pressure test. After maintenance, the valve sealing performance was restored, and the system pressure remained stable. Key Takeaway: For gate valves in high-abrasion environments, regularly inspect the valve core and seat, and replace the valve in time if wear is found.

Case 3: Power Tong Die Wear & Slip Failure

Fault Phenomenon: The XQ140/12A power tong equipped with XYQ12A tong dies (73-78MM) had difficulty clamping drill pipes, and the tong dies slipped during operation, unable to complete pipe making-up and breaking-out operations. Reason Analysis: The tong die surface was severely worn, and the tooth profile was flattened, reducing the friction force between the tong die and the drill pipe. Solution: Replace the worn tong dies with new XYQ12A tong dies (73-78MM), adjust the clamping force of the power tong, and test run. After replacement, the power tong could clamp the drill pipe firmly, and the slip failure was resolved, ensuring normal drilling operations. Key Takeaway: Tong dies are high-wear parts; inspect them daily and replace them in time to avoid operational safety hazards and delays.

FAQ (Frequently Asked Questions)

Question

Answer

Are your spare parts compatible with SDPROSPERITY drilling pumps and XQ140/12A power tongs?

Yes, all our spare parts are strictly designed according to the specifications of SDPROSPERITY drilling pumps, XQ140/12A power tongs, and other equipment models. For example, the PISTON 012180493 VT1015-62L is specifically matched to SDPROSPERITY drilling pumps, and XYQ12A tong dies are tailored for XQ140/12A power tongs. We ensure full compatibility with the original equipment, allowing direct installation without modification.

How can I confirm the correct spare part for my specific valve or mud pump component?

You only need to provide us with the part number (e.g., 012180493 VT1015-62L, J007420-2522110), equipment model (e.g., F-1300 mud pump, XQ140/12A power tong), or the specific function of the part. Our professional technical team will verify the compatibility for you and recommend the correct spare part, ensuring you purchase the right product at the first time.

Do you provide technical guidance for the installation and maintenance of spare parts?

Yes, we have a professional technical team with rich on-site drilling equipment maintenance experience. We can provide detailed installation and maintenance guidelines for all spare parts through phone, video, or written documents. For complex on-site faults, we can also arrange technical personnel to provide on-site support (subject to on-site conditions), helping you resolve problems quickly and reduce equipment downtime.

Procurement Guidance

Whether you need emergency replacement parts to resolve sudden on-site equipment failures or regular maintenance components to ensure the long-term stable operation of your drilling rigs, we can provide you with high-quality, compatible, and cost-effective drilling rig spare parts. Our product portfolio covers all the parts listed in your requirements, including transmission components, mud pump parts, valve parts, power tong parts, and auxiliary components, and we can also provide customized solutions according to your specific equipment models and operational needs.

To ensure you purchase the correct parts efficiently, we recommend providing us with the part number, equipment model, and specific application scenario when placing an order. Our professional procurement and technical team will confirm the compatibility for you, provide detailed product parameters and quality inspection reports, and offer competitive pricing and comprehensive after-sales support. We are committed to becoming your reliable partner for drilling rig spare parts supply, helping you control procurement costs, improve maintenance efficiency, and ensure uninterrupted drilling operations—supporting your project success with high-quality products and professional services.

 

contact us 

Emeil: [email protected]   whatsapp: +86 15275658619

Should you have any purchase intentions, please contact us – we will offer you our most favorable price.

 


Prosperity Petroleum Equipment

Quick Inquiry