1. Core Purpose & Equipment Adaptation
This document focuses on the Oil Pump Lines System (Model: Z07010000003AA) exclusively designed for the SJ Petro Rig ZJ40, covering all supporting components such as supports, steel pipes, hose assemblies, fittings, pipe clamps, bolts, and sealing parts (full component models are provided in the original accessory list). It is tailored to meet the segmented needs of petroleum drilling professionals, including drilling engineering teams, on-site maintenance technicians, procurement personnel, and equipment management staff. As a critical core component of the SJ Petro Rig ZJ40’s hydraulic system, the oil pump lines are mainly responsible for transmitting clean, high-pressure hydraulic oil from the oil pump to key hydraulic components of the rig—such as hydraulic motors, cylinders, and control valves—ensuring the stable operation of core rig functions including hoisting, drilling, and positioning. All components fully comply with international and industry standards such as SAE J517 (Hydraulic Hose Standards), ANSI/ASME B1.20.1 (Pipe Thread Standards), and GB (National Standards of China), guaranteeing perfect compatibility with the SJ Petro Rig ZJ40, reliable sealing performance, and strong pressure resistance. Choosing this oil pump line system and its matching original accessories avoids costly equipment downtime caused by mismatched, low-quality parts, reduces maintenance frequency and costs, and ensures the SJ Petro Rig ZJ40 operates safely and efficiently in harsh petroleum drilling environments.
2. Product Introduction
The Oil Pump Lines (Z07010000003AA) for SJ Petro Rig ZJ40 is an integrated, high-pressure hydraulic oil transmission system composed of precision-manufactured pipelines, connectors, fixing components, and sealing parts. It is specifically developed to adapt to the working characteristics of the SJ Petro Rig ZJ40, integrating oil transmission, connection, fixing, and sealing functions into one. The system includes various specifications of steel pipes (25mm, 32mm, etc.) and hose assemblies (6I, 25I, 32I, 45II series), as well as a full set of fittings, flanges, pipe clamps, and sealing components, covering all oil transmission needs of the rig’s oil pump system. All components are made of high-quality materials: steel pipes adopt seamless carbon steel with precision honing, hose assemblies use multi-layer steel wire reinforcement and oil-resistant nitrile rubber, and fittings and fixing parts are made of high-strength carbon steel with anti-corrosion galvanizing treatment. Each component strictly follows the model specifications of the original SJ Petro Rig ZJ40, ensuring dimensional accuracy, tight connection, and long service life, and is fully compatible with the rig’s existing hydraulic system without any modification.
3. Function Description
The Oil Pump Lines System (Z07010000003AA) undertakes multiple critical functions for the SJ Petro Rig ZJ40’s hydraulic system, with coordinated operation between components to ensure stable and efficient oil transmission:
High-Pressure Oil Transmission: Through high-quality seamless steel pipes and reinforced hose assemblies, the system stably transmits high-pressure hydraulic oil (working pressure up to 31.5MPa) from the oil pump to each key hydraulic component of the rig, ensuring continuous and sufficient oil supply for core operations such as rig hoisting and drilling.
Secure Connection & Sealing: Using precision fittings, flanges, and sealing components (O-rings, combined sealing washers), the system achieves tight connection between all parts of the oil transmission line, preventing hydraulic oil leakage. This avoids energy waste, maintains system pressure stability, and prevents environmental pollution caused by oil leakage.
Pipeline Fixing & Protection: Pipe clamps, supports, pipe seat plates, and press plates firmly fix the steel pipes and hose assemblies to the rig body, reducing pipeline displacement, friction, and vibration during the rig’s high-intensity operation. This prevents pipeline fatigue, wear, and damage, ensuring the structural stability of the entire oil transmission system.
Oil Flow Diversion & Direction Control: Tees, elbows, and sub-components in the system realize oil flow diversion and direction adjustment, ensuring hydraulic oil is accurately delivered to each hydraulic component of the rig, meeting the different oil supply needs of various mechanisms.
System Protection: Sealing components and anti-corrosion treated parts prevent external impurities (dust, water, drilling fluid) from entering the pipeline system, avoiding abrasion, blockage, or corrosion of the oil pump and downstream hydraulic components, extending the service life of the entire hydraulic system.
4. Structural Characteristics
The Oil Pump Lines System (Z07010000003AA) for SJ Petro Rig ZJ40 adopts a scientific and reasonable structural design, combining practicality, stability, and maintainability, with the following prominent characteristics:
High Pressure Resistance: The system is designed for high-pressure operation, with steel pipes and hose assemblies able to withstand a maximum working pressure of 31.5MPa, which is higher than the actual working pressure of the SJ Petro Rig ZJ40’s oil pump. This effectively prevents pipeline bursting or leakage caused by pressure impact during rig operation.
Standardized & Compatible Design: All components strictly follow the original model specifications of the SJ Petro Rig ZJ40 and comply with SAE J517, ANSI/ASME B1.20.1, and other standards. This ensures unified dimensional standards and interface specifications, realizing 100% compatibility with the rig’s existing hydraulic system and easy replacement of accessories.
Corrosion & Wear Resistance: Metal components (fittings, pipe clamps, bolts, supports) are treated with hot-dip galvanizing or anti-rust coating, which can resist corrosion from outdoor rain, dust, and drilling fluid. Hose assemblies adopt oil-resistant, wear-resistant, and aging-resistant rubber materials, suitable for long-term use in harsh environments.
Modular & Easy to Maintain: The system adopts a modular structure, dividing the oil transmission line into multiple segments connected by detachable fittings. This facilitates on-site inspection, maintenance, and replacement of damaged components (such as hose assemblies and fittings) without disassembling the entire pipeline system, reducing maintenance time and labor costs.
Stable Fixing Structure: Supports, pipe seat plates, and press plates are designed according to the structural characteristics of the SJ Petro Rig ZJ40, with strong bearing capacity and stable fixing. They effectively absorb pipeline vibration during rig operation, avoid pipeline fatigue damage, and ensure the stability of oil transmission.
Flexible Adaptation: Hose assemblies of different lengths and specifications (6I-900mm to 45II-3000mm) adapt to the spatial layout of the rig, ensuring smooth oil transmission even in narrow or complex installation positions, avoiding excessive pipeline bending or tension.
5. Applicable Working Conditions
The Oil Pump Lines System (Z07010000003AA) is specifically designed for the harsh working environment of the SJ Petro Rig ZJ40, with strong environmental adaptability, suitable for the following petroleum drilling working conditions:
Outdoor Petroleum Drilling Sites: Adaptable to extreme temperature changes (-30℃ ~ +60℃), able to resist rain, snow, strong wind, and intense sunlight, ensuring normal oil transmission even in harsh weather conditions.
Dusty & High-Humidity Environments: Suitable for desert, coastal, and other drilling areas with high dust and high humidity. The anti-corrosion components and sealing system effectively prevent dust, water, and other impurities from entering the pipeline, avoiding component corrosion and blockage.
High-Vibration & High-Intensity Operation Scenarios: The stable fixing structure and shock-resistant components can withstand the high-intensity vibration generated during the SJ Petro Rig ZJ40’s hoisting, drilling, and other operations, preventing pipeline loosening, leakage, and damage.
Oilfield Corrosive Environments: Resistant to corrosion from oil mist, drilling fluid, and other corrosive media in oilfields, ensuring the pipeline system maintains good performance during long-term use, reducing maintenance frequency.
Mobile Drilling Scenarios: The modular structure and standardized components facilitate the disassembly, assembly, and transportation of the pipeline system when the rig is transferred between drilling sites, improving the efficiency of equipment transfer and installation.
6. Maintenance & Care Suggestions
To extend the service life of the Oil Pump Lines System (Z07010000003AA), ensure its stable operation, and reduce maintenance costs, the following practical maintenance and care suggestions are provided for on-site maintenance personnel:
Daily Inspection (Before Rig Operation): Check all pipeline connections (fittings, flanges, hose joints) for oil leakage; check the surface of steel pipes and hose assemblies for wear, bulging, or cracking; check pipe clamps, supports, and press plates for looseness, and re-tighten if necessary; check the O-rings and sealing washers for aging or damage, and replace immediately if any abnormality is found.
Weekly Maintenance: Clean the surface of the pipeline system to remove dust, oil stains, and drilling fluid residues; inspect the thread connections of fittings for wear or corrosion, and apply anti-rust oil or thread sealant if necessary; check the hose assemblies for excessive bending or tension, and adjust the pipe clamps to ensure the hoses are in a natural state; check the bolts and spring washers for looseness or corrosion, and replace if necessary.
Monthly Maintenance: Disassemble and inspect the flanges and key fittings, clean the sealing surfaces, and replace aging or damaged sealing components; check the steel pipes for rust, deformation, or blockage, and clean or replace if necessary; inspect the hose assemblies for aging (if the rubber becomes hard, brittle, or cracked), and replace immediately; conduct a pressure test on the pipeline system (test pressure 1.5 times the working pressure) to check for hidden leaks.
Quarterly Maintenance: Inspect all pipe clamps, supports, pipe seat plates, and press plates for deformation or wear, and replace if necessary; check all fittings and subs for thread wear, and replace if the threads are damaged or slippery; clean the entire pipeline system to remove internal oil sludge and impurities, ensuring smooth oil transmission; calibrate the connection torque of all fittings to ensure tight sealing.
Long-Term Shutdown Maintenance: If the rig is shut down for more than 1 month, drain the hydraulic oil in the pipeline system; disassemble the hose assemblies and store them in a dry, clean place (avoid extrusion and collision); clean all metal components and apply anti-rust grease to prevent corrosion; cover the pipeline ports with dust caps to prevent dust intrusion; store all disassembled components in a dry, ventilated warehouse.
Key Notes: Use only original matching accessories for replacement (strictly follow the model specifications in the original list); do not use damaged, expired, or non-original components, as they may cause pipeline leakage, bursting, or damage to the oil pump; avoid over-tightening fittings or bolts to prevent thread damage or component deformation; during maintenance, avoid dragging or bending the pipeline excessively to prevent pipeline damage.
Z07010000003AA | Oil pump lines |
Z07010100003AA | Support |
P7100243AA | Pipe seat plate |
P7200173AA | Press plate |
P7100244AA | Pipe seat plate |
P7200174AA | Press plate |
P0200189AA | Flange disc |
Z07010100002AA | Support |
P0200186AA | Flange disc |
P9970766AA | Steel pipe 25 L≈2.5m |
P2100274AA | Steel pipe 32 |
P9970767AA | Steel pipe 32 L≈900mm |
1101001025 | Hose assembly 6I-1200 |
1101001022 | Hose assembly 6I-900 |
1101001024 | Hose assembly 6I-1100 |
1101015054 | Hose assembly 25I-3500 |
1101015056 | Hose assembly 25I-4000 |
1101015060 | Hose assembly 25I-4500 |
1101019086 | Hose assembly 32I-2800 |
1101019087 | Hose assembly 32I-2900 |
1101019088 | Hose assembly 32I-3000 |
1101025080 | Hose assembly 45II-3000 |
QBJ5015212 | M55X2-NPT1.1/2" fitting |
QBJ6141010 | NPT1.1/4" elbow |
QBJ5221010 | NPT1.1/4" fitting |
QBJ10011008 | NPT1.1/4"-NPT1" bushing |
QBJ5013908 | M39X2-NPT1" fitting |
QBJ806101010 | NPT1.1/4" tee |
QBJ6013908 | M39X2-NPT1" fitting |
QBJ6131212 | NPT1.1/2" elbow |
QBJ11011255 | NPT1.1/2" sub |
QBJ6014512 | M45X2-NPT1.1/2" fitting |
QBJ120110 | NPT1 1/4" screw plug |
QBJ6130808 | NPT1" elbow |
QBJ110108190 | NPT1" sub |
QBJ110110180 | NPT1.1/4" sub |
QBJ6014510 | M45X2-NPT1.1/4" fitting |
QBJ5014510 | M45X2-NPT1.1/4" fitting |
QBJ6131010 | NPT1.1/4" elbow |
QBJ6011202 | M12X1.5-NPT1/4" fitting |
QBJ806020202 | NPT1/4" tee |
QBJ10130214 | M14X1.5-NPT1/4" bushing |
QBJ5011202 | M12X1.5-NPT1/4" fitting |
QBJ5230202 | NPT1/4" fitting |
QBJ7014510 | M45X2-NPT1.1/4"135 fitting |
QBJ11040850 | NPT1" pipe clamp |
QBJ11041055 | NPT1.1/4" pipe clamp |
4313100008 | Spring washer 8 |
4316808030 | Bolt M8X30 |
4301308016 | Bolt M8X16 |
5300100211 | O ring 75X3.55 |
5300100203 | O ring 71X3.55 |
4301310020 | Bolt M10X20 |
4313100010 | Spring washer 10 |
5300300011 | Combined sealing washer 48 |
QBJ10041008 | Sub NPT1"X50 |
QBJ11010850 | Bushing Rc1/4"-NPT1" |
P9970765AA | Steel pipe |
P9970768AA | Steel pipe 32 L≈720mm |
1101019109 | Hose assembly 32I-5500 |
QBJ110112300 | Sub NPT1-1/2"X300 |
QBJ110112190 | Sub NPT1-1/2"X190 |
P1300739AA | Fitting |
QBJ5201102 | 7/16-20UNF-Z1/4 fitting |
7. On-Site Fault Maintenance Cases
The following are 4 real on-site fault maintenance cases of the Oil Pump Lines System (Z07010000003AA) for SJ Petro Rig ZJ40, which are common in petroleum drilling scenarios. Each case includes fault phenomena, root causes, and practical solutions, providing direct reference for on-site maintenance personnel:
Case 1: Oil Leakage at Flange Connections, Resulting in System Pressure Drop
Fault Phenomenon: During the drilling operation of the SJ Petro Rig ZJ40, the hydraulic system pressure drops rapidly from 25MPa to 15MPa, and a large amount of hydraulic oil leaks from the flange disc (P0200186AA) connection of the oil pump line. The rig’s drilling speed slows down significantly, and the hydraulic cylinder fails to work normally.
Root Cause: Long-term vibration during the rig’s operation leads to loosening of the bolts (M10X20) and spring washers (10) at the flange connection; the O-ring (75X3.55) at the flange sealing surface ages and loses elasticity, resulting in poor sealing and oil leakage; maintenance personnel did not check the flange connection during daily inspection.
Solution: Stop the rig operation, cut off the oil pump power supply, and drain the hydraulic oil in the affected pipeline segment; disassemble the flange connection, remove the aging O-ring, and replace it with a new original O-ring (75X3.55); clean the flange sealing surface to remove oil stains and impurities; re-install the flange, and use a torque wrench to tighten the bolts evenly to the specified torque (35N·m); refill the hydraulic oil, start the oil pump, and conduct a pressure test to confirm no oil leakage; after the test, reset the system pressure to 25MPa, and start the rig to check the operation status. The fault is completely resolved, and the system pressure remains stable.
Case 2: Hose Assembly Bursting, Resulting in Oil Loss and Equipment Shutdown
Fault Phenomenon: During the hoisting operation of the SJ Petro Rig ZJ40, a sudden "pop" sound is heard, and the hose assembly (1101025080, 45II-3000) of the oil pump line bursts. A large amount of hydraulic oil leaks, and the hoisting mechanism stops working immediately, posing a safety hazard.
Root Cause: The hose assembly has been used for 11 months, exceeding the recommended replacement cycle (8-10 months); long-term high-pressure operation and frequent bending cause fatigue and breakage of the internal steel wire reinforcement layer; the outer rubber layer of the hose is worn by friction with the rig body, accelerating aging and bursting under high pressure.
Solution: Stop the rig operation immediately, cut off the oil pump power supply, and block the pipeline ports to prevent residual oil leakage; replace the burst hose assembly with a new original hose assembly (1101025080, 45II-3000); adjust the pipe clamp (QBJ11041055) position to avoid friction between the new hose and the rig body; check the adjacent hose assemblies for wear or aging, and replace any abnormal ones; refill the hydraulic oil, start the oil pump, and conduct a pressure test (30MPa) to confirm no leakage; restart the rig, and the hoisting mechanism operates normally. It is recommended to shorten the replacement cycle of 45II series hose assemblies to 8 months in high-intensity operation scenarios.
Case 3: Fitting Blockage, Resulting in Insufficient Oil Supply
Fault Phenomenon: The SJ Petro Rig ZJ40’s hydraulic motor operates intermittently during operation, and the oil supply to the motor is insufficient. After inspection, the M39X2-NPT1" fitting (QBJ5013908) of the oil pump line is blocked, and the oil flow through the fitting is significantly reduced.
Root Cause: The hydraulic oil is not replaced in time, and a large amount of oil sludge and impurities accumulate in the oil; the oil filter fails to filter effectively, leading to impurities entering the pipeline and accumulating in the fitting’s internal channel; the fitting’s thread connection is not sealed tightly, allowing external dust to enter and form blockages.
Solution: Stop the rig operation, disassemble the blocked fitting (QBJ5013908), and clean the internal channel with clean diesel oil to remove oil sludge and impurities; check the fitting for thread wear, and replace it if necessary; replace the oil filter element of the hydraulic system, and drain the old hydraulic oil, replacing it with new hydraulic oil that meets the rig’s requirements; re-install the fitting, apply thread sealant to ensure tight sealing; start the oil pump, and check the oil flow through the fitting. The fault is resolved, and the hydraulic motor operates stably.
Case 4: Pipe Clamp Loosening, Resulting in Pipeline Wear and Oil Leakage
Fault Phenomenon: During the long-term operation of the SJ Petro Rig ZJ40, the steel pipe (P9970767AA, 32mm) of the oil pump line wears severely at the pipe clamp (QBJ11040850) position, and oil leaks from the wear point. The pipeline shakes violently during operation, and the wear becomes more serious.
Root Cause: The pipe clamp (QBJ11040850) bolts (M8X30) loosen due to long-term rig vibration; the pipe clamp’s inner rubber gasket ages and falls off, resulting in direct contact between the steel pipe and the metal pipe clamp; the pipeline shakes violently during operation, causing friction between the steel pipe and the pipe clamp, leading to wear and oil leakage.
Solution: Stop the rig operation, cut off the oil pump power supply, and drain the hydraulic oil in the worn pipeline segment; replace the worn steel pipe (P9970767AA) with a new original steel pipe; replace the loose pipe clamp (QBJ11040850) and its inner rubber gasket with new original parts; re-install the pipe clamp at a reasonable position, and tighten the bolts to the specified torque; check all other pipe clamps on the oil pump line, re-tighten loose bolts, and replace aging rubber gaskets; refill the hydraulic oil, start the oil pump, and confirm no oil leakage. The pipeline shakes significantly reduced, and the wear problem is completely solved.
8. FAQ (Frequently Asked Questions)
No. | Questions | Answers |
1 | Are all components of this oil pump line system fully compatible with the SJ Petro Rig ZJ40? | Yes, all components are specifically designed and produced for the SJ Petro Rig ZJ40, strictly following the original equipment’s model specifications, dimensional standards, and interface requirements (such as Z07010100003AA support, 1101015054 hose assembly). Each component is 100% compatible with the rig’s existing hydraulic system and oil pump. At the same time, all components comply with SAE J517 and ANSI/ASME standards, ensuring reliable connection and stable performance after installation. |
2 | What is the maximum working pressure of this oil pump line system, and what should I do if the pipeline leaks? | The maximum working pressure of the system is 31.5MPa, which fully meets the high-pressure oil transmission needs of the SJ Petro Rig ZJ40’s oil pump. If pipeline leakage occurs, first stop the rig operation and cut off the oil pump power supply to avoid further oil loss and safety hazards; then locate the leak point (common leak points include flange connections, fitting joints, and hose ends); replace aging or damaged sealing components (O-rings, sealing washers), re-tighten loose connections, or replace worn hoses/fittings with original parts; after handling, conduct a pressure test to confirm no leakage before restarting the rig. |
3 | How often should key components (hose assemblies, fittings, sealing parts) be replaced, and can non-original accessories be used? | Recommended replacement cycles for key components: Hose assemblies (6I, 25I, 32I, 45II series) - every 8-10 months; Fittings - every 12 months (or immediately if thread wear is found); Sealing parts (O-rings, combined sealing washers) - every 6 months or when aging/damage is found. Non-original accessories are not recommended, as they often have dimensional deviations, poor pressure resistance, or insufficient sealing performance, which can easily cause pipeline bursting, oil leakage, and even damage the oil pump and hydraulic components, increasing maintenance costs and safety risks. |
4 | What are the common causes of pipe blockage in the oil pump line system, and how to prevent it? | Common causes of pipe blockage include: Accumulation of oil sludge and impurities due to delayed hydraulic oil replacement; Failure of the oil filter to filter effectively; External dust entering the pipeline through loose connections. To prevent blockage: Replace the hydraulic oil and oil filter element regularly (every 3 months); Check and tighten all pipeline connections regularly to prevent dust intrusion; Clean the pipeline system every quarter to remove internal oil sludge and impurities; Avoid mixing different types of hydraulic oil. |
5 | How to maintain the oil pump line system when the SJ Petro Rig ZJ40 is transferred between drilling sites? | When transferring the rig, follow these maintenance steps: ① Cut off the oil pump power supply and drain all hydraulic oil in the pipeline system; ② Disassemble the hose assemblies, fittings, and other detachable components, and store them in a dry, clean place (avoid collision and extrusion); ③ Clean the steel pipes and pipeline ports, and cover them with dust caps to prevent dust intrusion; ④ Check the supports, pipe clamps, and steel pipes for deformation or wear, and repair or replace if necessary; ⑤ After transferring to the new site, assemble the components in accordance with the original installation requirements, refill the hydraulic oil, conduct a pressure test to check for leakage, and confirm the system is normal before use. |
9. Procurement Guide
The Oil Pump Lines System (Z07010000003AA) and its supporting components for SJ Petro Rig ZJ40 are professional, high-performance products developed exclusively for petroleum drilling equipment, integrating reliability, durability, and maintainability. All components are made of high-quality materials, strictly follow SAE J517, ANSI/ASME B1.20.1, and other international and industry standards, and undergo strict quality inspection and pressure testing before leaving the factory. This ensures perfect compatibility with the SJ Petro Rig ZJ40, strong pressure resistance, tight sealing, and long service life in harsh drilling environments. Choosing this system and its original accessories can effectively solve the common problems of inferior products—such as mismatching, poor sealing, short service life, and easy bursting—avoid costly equipment downtime, reduce maintenance frequency and costs, and ensure the continuous and stable operation of your SJ Petro Rig ZJ40. We provide a complete set of accessories (covering all models in the original list), as well as professional technical support and after-sales service, including on-site installation guidance, maintenance training, and fault handling advice. Whether you need to purchase a complete oil pump line system, replace worn components, or reserve spare parts for emergencies, we can meet your personalized procurement needs. Please refer to the original accessory list for the specific model and quantity of the required components, and contact us for procurement. We are committed to providing you with high-quality products, reasonable prices, and thoughtful service, helping you improve the operation efficiency of the rig, reduce operational risks, and create greater value for your petroleum drilling operations.
contact us :
Emeil: [email protected] whatsapp: +86 15275658619
Should you have any purchase intentions, please contact us – we will offer you our most favorable price.