1. Product Introduction
The FZ35-35U (single ram) and 2FZ35-35U (double ram) Ram-Type Blowout Preventers (BOPs) are critical well control devices engineered for oil and gas drilling operations, designed to mitigate blowout risks by sealing the wellbore during drilling, completion, and workover activities. Manufactured in strict compliance with API Spec 16A (Specification for Wellhead and Christmas Tree Equipment) and GB/T 22513 standards, these BOPs feature a 13 5/8-inch (346.1mm) bore and 35MPa (5000psi) rated working pressure, making them ideal for medium-pressure drilling scenarios.
Crafted with high-strength alloy steel bodies and precision-engineered sealing components, the FZ35-35U series delivers reliable pressure containment and rapid response to wellbore pressure surges. The product line supports multiple ram configurations—including pipe rams, shear rams, and variable bore rams (VBR)—to accommodate diverse downhole tools and pipe sizes, from 2 3/8-inch to 11 3/4-inch drill pipes and casings. All critical components, such as the hydraulic cylinder assembly, secondary sealing mechanism, and bonnet seals, undergo rigorous non-destructive testing (NDT) including ultrasonic and magnetic particle inspections to ensure compliance with HSE and industry reliability requirements.
2. Core Purpose
The primary purpose of the FZ35-35U and 2FZ35-35U BOPs is to provide fail-safe wellbore isolation for onshore and shallow offshore drilling operations, addressing the subdivided needs (segmented needs) of E&P (Exploration and Production) companies, drilling contractors, and well service providers. Specifically, these BOPs are designed to: seal the annular space around drill pipes/casings (pipe rams), cut through drill pipe to isolate the wellbore in emergency scenarios (shear rams), and adapt to multiple pipe sizes without ram replacement (variable bore rams).
They serve as a core component of the well control system, working in tandem with choke manifolds, kill lines, and hydraulic control units to maintain wellbore integrity, prevent formation fluid influx (kick), and mitigate blowout hazards. The double ram model (2FZ35-35U) offers enhanced redundancy for high-risk operations, while the single ram model (FZ35-35U) provides a cost-effective solution for standard drilling environments—both tailored to minimize downtime and ensure operational safety.
3. Functional Description
3.1 Ram Operation
The BOPs utilize hydraulic actuation with a rated control pressure of 21MPa (3000psi) and a recommended operating pressure range of 8.4-10.5MPa (1200-1500psi) for optimal performance. The closing ratio is 11.6:1 (23.3:1 with tandem booster), enabling rapid ram deployment to seal the wellbore. Pipe rams feature precision-machined profiles to match specific pipe diameters, while shear rams (model SBR3570CC.00) are engineered to cut drill pipe under full pressure, providing emergency well isolation. Variable bore rams (VBR3570CA.00 and VBR3570CB.00) adapt to multiple pipe sizes (2 7/8"-5" and 4 1/2"-7" respectively) to reduce tool change time.
3.2 Sealing Mechanisms
Dual sealing protection is achieved through primary and secondary sealing systems. Primary seals include top, front, and piston rod seals (Y-rings, U-seals, and O-rings) designed for high-pressure resistance and wear durability. The secondary sealing mechanism uses grease injection (EM-09-01 grease) via check valves and plug cocks to reinforce sealing integrity during primary seal degradation. Bonnet seals (floating seal assembly 2C12.08.00) prevent pressure leakage at the ram housing interface, with floating seal skeletons ensuring uniform pressure distribution.
3.3 Hydraulic Actuation
The hydraulic cylinder assembly (standard and tandem booster configurations) drives ram movement, with U-seals and backup rings preventing hydraulic fluid leakage. Tandem boosters enhance closing force for heavy-duty applications, increasing the closing ratio to 23.3:1. Locking screws (39 turns per end) mechanically secure rams in the closed position, eliminating reliance on hydraulic pressure for long-term sealing. Ram change cylinders facilitate quick ram replacement, reducing maintenance downtime.
4. Structural Features
4.1 Robust Body Design
The BOP body is fabricated from forged alloy steel, offering exceptional mechanical strength and corrosion resistance. It features a compact design with a 346.1mm (13 5/8") bore to accommodate standard drill pipe sizes, with nozzle flanges for connection to choke and kill lines. The single ram model (FZ35-35U) weighs 6450kg, while the double ram model (2FZ35-35U) weighs 10764kg, both optimized for easy installation on drill floors and wellheads.
4.2 Modular Ram System
The modular ram design allows for quick interchange between pipe, shear, and variable bore rams, with standardized mounting interfaces reducing tooling complexity. Ram assemblies include replaceable top and front seals, enabling targeted maintenance without full ram replacement. Shear ram bodies (upper and lower) are heat-treated for enhanced cutting performance, while variable bore rams use flexible front packers to adapt to different pipe diameters.
4.3 Redundancy & Safety
The 2FZ35-35U double ram model incorporates dual ram assemblies for redundant sealing, critical for high-risk operations. All hydraulic components meet API RP 53 (Recommended Practice for Well Control Equipment Systems for Drilling Wells) standards, with check valves preventing backflow in the secondary sealing system. Locking screws provide mechanical backup to hydraulic actuation, ensuring rams remain closed during power failures.
5. Applicable Working Conditions
The FZ35-35U series BOPs are engineered for onshore and shallow offshore drilling operations, compatible with the following conditions:
Pressure Range: Rated working pressure of 35MPa (5000psi), suitable for medium-pressure formations (up to 52.5MPa hydrostatic test pressure).
Temperature Rating: T-20 rating, operational in temperatures from -20℃ to +121℃ (-4℉ to 250℉), compatible with most drilling fluids including water-based, oil-based, and synthetic muds.
Wellbore Sizes: Accommodates 2 3/8"-11 3/4" drill pipes and casings, ideal for vertical and deviated wells (up to 45° inclination).
Environmental Conditions: Corrosion-resistant design for humid, dusty, and coastal environments, with sealing components resistant to drilling fluid contamination.
Operation Types: Drilling, completion, workover, and well testing operations, including emergency well control scenarios.
6. Maintenance & Care Recommendations
6.1 Routine Maintenance
Daily Inspections: Check hydraulic lines for leaks, verify ram position indicators, and inspect secondary sealing grease levels. Test the hydraulic actuation system to ensure smooth ram movement (open/close cycles).
Weekly Checks: Inspect primary seals (O-rings, U-seals) for wear, cracks, or deformation; replace damaged seals immediately. Clean nozzle flanges and check bolt torque to prevent pressure leakage. Test the locking screw mechanism for proper engagement.
Monthly Servicing: Flush the hydraulic system to remove contaminants; replace hydraulic fluid if discolored or contaminated. Calibrate pressure gauges and test the secondary sealing grease injection system. Inspect ram faces for wear and damage.
6.2 Preventive Maintenance
Adhere to API RP 53 and manufacturer guidelines for preventive maintenance scheduling. Replace all primary seals every 6 months or 500 operating hours (whichever comes first). Conduct non-destructive testing (ultrasonic) on the BOP body annually to detect internal cracks. Refill secondary sealing grease every 3 months, and replace shear ram blades after one emergency cut or 1000 operating hours.
6.3 Storage & Handling
Store BOPs in a clean, dry environment, with rams in the open position to prevent seal compression. Cover nozzle flanges and hydraulic ports to prevent contamination. When transporting, secure the BOP to avoid vibration damage to seals and hydraulic components. Before reinstallation, inspect all seals and lubricate moving parts with compatible grease (EM-09-01).
FZ35-35U Ram BOP
Specification and Main Technical Parameters of Ram-type Blowout Preventer
Description | Double Ram BOP | Single Ram BOP |
Model | 2FZ35-35U | FZ35-35U |
Bore | 346.1mm(13 5/8 in) | |
Rated working pressure | 35MPa(5000psi) | |
hydrostatic test pressure | 52.5MPa (7500psi) | |
Hydraulic-control rated working pressure | 21 MPa(3000psi) | |
Recommended hydraulic-control operation pressure | 8.4-10.5MPa(1200-1500psi) | |
Opening Volume | 21L×4 | 21L×2 |
Closing Volume | 22L×4+19.1L×2 | 22L×2+19.1L×2 |
Closing Ratio | 11.6:1 | |
Closing Ratio (With Tandem booster) | 23.3:1 | |
Locking Screw turns (each end) | 39 | |
Temperature rating | T-20 | |
Weight | 10764kg | 6450kg |
Pipe Ram Parts Table
Ram Type | Pipe Ram Name (quantity) | |||
Ram Assembly | Ram Body (2) | Top Seal(2) | Front seal(2) | |
Blind | 2C02.01A.00 | 2C02.01A.01 | 2C02.01A.02 | 2C02.01A.03 |
2 3/8″ | 2C02.01B.00 | 2C02.01B.01 | 2C02.01B.02 | 2C02.01A.03 |
2 7/8″ | 2C02.01C.00 | 2C02.01C.01 | 2C02.01C.02 | 2C02.01A.03 |
3 1/2″ | 2C02.01D.00 | 2C02.01D.01 | 2C02.01D.02 | 2C02.01A.03 |
4 ″ | 2C02.01E.00 | 2C02.01E.01 | 2C02.01E.02 | 2C02.01A.03 |
4 1/2″ | 2C02.01F.00 | 2C02.01F.01 | 2C02.01F.02 | 2C02.01A.03 |
5″ | 2C02.01G.00 | 2C02.01G.01 | 2C02.01G.02 | 2C02.01A.03 |
5 1/2″ | 2C02.01H.00 | 2C02.01H.01 | 2C02.01H.02 | 2C02.01A.03 |
6 | 2C02.01I.00 | 2C02.01I.01 | 2C02.01I.02 | 2C02.01A.03 |
6 5/8″ | 2C02.01J.00 | 2C02.01J.01 | 2C02.01J.02 | 2C02.01A.03 |
7″ | 2C02.01K.00 | 2C02.01K.01 | 2C02.01K.02 | 2C02.01A.03 |
7 5/8″ | 2C02.01L.00 | 2C02.01L.01 | 2C02.01L.02 | 2C02.01A.03 |
7 3/4″ | 2C02.01M.00 | 2C02.01M.01 | 2C02.01M.02 | 2C02.01A.03 |
8 5/8″ | 2C02.01N.00 | 2C02.01N.01 | 2C02.01M.02 | 2C02.01A.03 |
9 | 2C02.01O.00 | 2C02.01O.01 | 2C02.01O.02 | 2C02.01A.03 |
9 5/8″ | 2C02.01P.00 | 2C02.01P.01 | 2C02.01P.02 | 2C02.01A.03 |
10 3/4″ | 2C02.01Q.00 | 2C02.01Q.01 | 2C02.01Q.02 | 2C02.01A.03 |
11 3/4″ | 2C02.01R.00 | 2C02.01R.01 | 2C02.01R.02 | 2C02.01A.03 |
4 3/4″ | 2C02.01S.00 | 2C02.01S.01 | 2C02.01S.02 | 2C02.01A.03 |
5 3/4″ | 2C02.01T.00 | 2C02.01T.01 | 2C02.01T.02 | 2C02.01A.03 |
5 7/8″ | 2C02.01U.00 | 2C02.01U.01 | 2C02.01U.02 | 2C02.01A.03 |
Shear Ram Assembly Parts Table
Name | Part No. |
Shear Ram Assembly | SBR3570CC.00 |
Left seal of shear ram | SBR3570CB.04.00 |
Lower shear ram body | SBR3570CC-01 |
Right seal of shear ram | SBR3570CB.03.00 |
Top seal | SBR3570CB.02.00 |
Upper shear ram body | SBR3570CC-02 |
Front seal | SBR3570CB.06.00 |
Variable Bore Ram Assembly Parts Table
Name | Part No. | Quantity |
VBR3570CB.00 4 1/2"-7"Variable Bore Ram Assembly VBR3570CA.00 2 7/8"-5"Variable Bore Ram Assembly | ||
Ram Body | VBR3570CA.01 | VBR3570CB.01 |
Top Seal | VBR3570CA.02.00 | VBR3570CA.02.00 |
Variable Ram Front Packer | VBR3570CA.03.00 | VBR3570CB.02.00 |
Sealing Parts List of Operating Piston Front Rod
Name | Part No. |
O-ring | 129.54×5.33 |
O-ring | 100.97×5.33 |
Supporting gland cover | C17.14 |
Gasket 102×5 | SKZF101.02 |
Y-Ring of ram shaft seal | SKZF101.01 |
Gasket | 2C02.18 |
Retainer ring 140 | 2C02.17 |
Secondary Sealing Mechanism Parts Table
Name | Part No. |
Z1″ Hexagonal plug | 2C01.21 |
Plug cock | SFZ1310-30 |
Secondary seal grease | 2 |
Check valve | SFZ1310-32.00 |
Z1/2″ hexagon socket screw plug | 2C01.32 |
Sealing Parts Table of Operating Piston Tail Rod
Description | Part No. |
U-Seal | Φ76.2×92.08×14.27/15.72 |
O-ring | 77.5×5.3 |
Bonnet Seal (Door Seal Ring) Assembly Parts List
Name | Part No. |
Floating seal assembly | 2C12.08.00 |
O-ring | 340×7 |
Floating seal skeleton | 2C12.08.01 |
O-ring | 360×5.3 |
BOP Parts List
Name | Part No./Model |
Body | 1 |
Floating seal assembly | 2C12.08.00 |
Ram assembly | 2C02.01().00 |
O-ring | 43.7×3.55 |
Nozzle flange | 2C01.25 |
Screw 1/2-13UNC×30 | 2C01.26 |
Z1 plug screw | 2C01.21 |
Hydraulic Cylinder Assembly Parts List
Description | Part No./Model |
Left Bonnet | 2C26.14 |
Right Bonnet | 2C26.15 |
Check valve | SFZ1310-32.00 |
Secondary seal grease | EM-09-01 |
Plug cock 1-8UNC | SFZ1310-30 |
Z1″ Hexagonal plug | 2C01.21 |
Bonnet bolt | 2C26.16 |
Ram change piston_Close | C17.12 |
Backup ring | Φ70×Φ80×1.9 |
O-ring | 69.6x5.7 |
Backup ring | Φ80.4×Φ89×1.7 |
O-ring | 78.74x5.33 |
Operating piston assembly | 2C26.12.00 |
U-seal | C011-22 Φ323×Φ355×24/26 |
O-ring | 339.5x8.4 |
Hydraulic Cylinder Assembly Parts List
Name | Part No./Model |
Backup ring | Φ341.6×Φ355×2.75 |
Cylinder head weldment | C21.04.00 |
Hydraulic cylinder bolt | C17.05 |
Cap nut M36×3 | C17.16 |
Locking screw | C17.01 |
Hexagon socket head cap screw M10×20 | GB/T70.1-2000 |
U-seal | Φ76.2XΦ92.08X14.27/15.72 |
O-ring | 104.14x5.33 |
Backup ring | Φ105.4xΦ114×1.7 |
Ram change cylinder | C21.11 |
Ram change piston_open | C17.15 |
Backup ring | Φ51.4×Φ60×1.7 |
O-ring | 50.17x5.33 |
Guide ring | 2C02.29 |
Z1/2″ hexagon socket screw plug | 2C01.32 |
Ram Guide Pin | 2C02.15 |
O-ring | 100.97x5.33 |
O-ring | 129.54x5.33 |
Supporting gland cover | C17.14 |
Gasket 102×5 | SKZF101.02 |
Ram shaft seal Y-Ring | SKZF101.01 |
Gasket | 2C02.18 |
Retainer ring 140 | 2C02.17 |
Operating cylinder | 2C31.13 |
O-ring | 77.5×5.3 |
Hook (I) | 2C02.11A-02 |
Hook (II) | 2C02.11A-03 |
Stop block | 2C02.11A-04 |
Piston rod | 2C26.12.01 |
O-ring | 100.97×5.33 |
Backup ring | Φ102.31×Φ111.61×1.52 |
Piston | C17.08.02 |
Stop block | C17.08.03 |
Socket head cap screw M12×20 | GB/T77 |
Parts List for Hydraulic Cylinder Assembly with Tandem Booster
Name | Part No./Model |
8A Left Bonnet | 2C31.02 |
Right Bonnet | 2C31.01 |
Check valve | SFZ1310-32.00 |
Secondary seal grease | EM-09-01 |
Plug cock 1-8UNC | SFZ1310-30 |
Z1″ Hexagonal plug | 2C01.21 |
Bonnet bolt | C26.16 |
Ram change piston_Close | C17.12 |
Backup ring | Φ70×Φ80×1.9 |
O-ring | 69.6x5.7 |
Backup ring | Φ80.4×Φ89×1.7 |
O-ring | 78.74x5.33 |
Operating piston assembly | 2C26.12.00 |
U-seal | C011-22 Φ323×Φ355×24/26 |
O-ring | 339.5x8.4 |
Backup ring | Φ341.6×Φ355×2.75 |
Cylinder head weldment | 2C31.03.00 |
Hydraulic cylinder bolt M39×3×558 | C31.05 |
Locking screw | C17.01 |
Hexagon socket head cap screw M10×20 | GB/T70.1-2000 |
U-seal | Φ76.2XΦ92.08X14.27/15.72 |
O-ring | 104.14x5.33 |
Backup ring | Φ105.4xΦ114×1.7 |
Ram change cylinder | C21.11 |
Ram change piston_open | C17.15 |
Backup ring | Φ51.4×Φ60×1.7 |
O-ring | 50.17x5.33 |
Guide ring | 2C02.29 |
Z1/2″ hexagon socket screw plug | 2C01.32 |
Ram Guide Pin | 2C02.15 |
O-ring | 100.97x5.33 |
O-ring | 129.54x5.33 |
Supporting gland cover | C17.14 |
Gasket 102×5 | SKZF101.02 |
Ram shaft seal Y-Ring | SKZF101.01 |
Gasket | 2C02.18 |
Retainer ring 140 | 2C02.17 |
Operating cylinder | 2C31.13 |
O-ring | 77.5×5.3 |
Filter, Muffler,Z1" | 1 |
Parts List for Hydraulic Cylinder Assembly with Tandem Booster
Name | Part No./Model |
Adapter | 2C31.04 |
O-ring | 375×5.3 |
Cylinder | 2C31.06 |
Connector, male, NPT1 | 2C31.09 |
O-ring | 32×3.55 |
Screw | GB/T70.1 M16×50 |
Oil Block | 2C31.11 |
O-ring | 53×5.3 |
Housing, Locking Screw | 2C26.07.00 |
Stud 1 1/2-8UN×6 1/4 | 2C01.13 |
Nut 1 1/2-8UN-2B | 2C01.14 |
Tail Rod | 2C31.08 |
Stud | 2C01.03.03 |
Plug | 2C01.36 |
Cylinder Head | 2C31.10 |
Piston | 2C31.07 |
Seal ring , Piston to Tail Rod | 2C01.03.10.00 |
Wear Ring, Piston to Tail Rod | 2C01.03.11 |
Wear Ring, Piston | 2C31.48 |
O-ring | 160×7 |
Hook (I) | 2C02.11A-02 |
Hook (II) | 2C02.11A-03 |
Stop block | 2C02.11A-04 |
Piston rod | 2C26.12.01 |
O-ring | 100.97×5.33 |
Backup ring | Φ102.31×Φ111.61×1.52 |
Piston | C17.08.02 |
Stop block | C17.08.03 |
Socket head cap screw M12×20 | GB/T77 |
One-year recommended spare parts list
Name | Part No./Model |
C31.100 FZ35-35U Single Ram BOP 2C31.100 2FZ35-35U Double Ram BOP | |
O-ring | 340×7 |
O-ring | 360×5.3 |
O-ring | 43.7×3.55 |
Secondary seal grease | EM-09-01 |
Backup ring | Φ70×Φ80×1.9 |
O-ring | 69.6x5.7 |
Backup ring | Φ80.4×Φ89×1.7 |
O-ring | 78.74x5.33 |
U-seal | C011-22 Φ323×Φ355×24/26 |
O-ring | 339.5x8.4 |
Backup ring | Φ341.6×Φ355×2.75 |
U-seal | Φ76.2XΦ92.08X14.27/15.72 |
O-ring | 104.14x5.33 |
Backup ring | Φ105.4xΦ114×1.7 |
Backup ring | Φ51.4×Φ60×1.7 |
O-ring | 50.17x5.33 |
Guide ring | 2C02.29 |
O-ring | 100.97x5.33 |
O-ring | 129.54x5.33 |
Gasket 102×5 | SKZF101.02 |
Ram shaft seal Y-Ring | SKZF101.01 |
O-ring | 77.5×5.3 |
O-ring | 375×5.3 |
O-ring | 32×3.55 |
O-ring | 53×5.3 |
Seal ring , Piston to Tail Rod | 2C01.03.10.00 |
Wear Ring, Piston to Tail Rod | 2C01.03.11 |
Wear Ring, Piston | 2C31.48 |
O-ring | 160×7 |
Stop block | 2C02.11A-04 |
Backup ring | Φ102.31×Φ111.61×1.52 |
Stop block | C17.08.03 |
7. Field Fault Repair Cases
Case 1: Primary Seal Leakage
Issue: Pressure leakage at the ram front seal during well testing with the FZ35-35U BOP. Root Cause: Drilling fluid contamination (sand particles) caused wear to the front seal (part 2C02.01A.02).Solution: Replaced the front seal and cleaned the ram face; flushed the hydraulic system to remove contaminants. Applied secondary sealing grease to reinforce the seal. Preventive Action: Added a filter to the drilling fluid circulation system and increased frequency of seal inspections in sandy formations.
Case 2: Hydraulic Actuation Failure
Issue: Ram failed to close on the 2FZ35-35U BOP. Root Cause: Clogged hydraulic filter in the tandem booster assembly, restricting fluid flow to the cylinder. Solution: Replaced the hydraulic filter (part 47), flushed the system, and tested actuation cycles. Adjusted hydraulic pressure to the recommended 9.5MPa. Preventive Action: Replaced hydraulic filters every 3 months and installed a pressure bypass valve to prevent system blockages.
Case 3: Secondary Sealing Malfunction
Issue: Secondary sealing grease failed to inject, compromising seal integrity. Root Cause: Clogged check valve (part SFZ1310-32.00) due to dried grease buildup. Solution: Disassembled and cleaned the check valve; replaced old grease with EM-09-01 secondary seal grease. Tested the injection system to ensure smooth grease flow. Preventive Action: Flushed the secondary sealing system every 2 months and stored grease in a temperature-controlled environment.
Case 4: Ram Locking Screw Jam
Issue: Locking screws failed to engage after closing the ram on the FZ35-35U BOP. Root Cause: Corrosion and debris buildup on the screw threads, caused by exposure to saltwater in a coastal drilling site. Solution: Cleaned the threads with a wire brush, applied anti-corrosion lubricant, and manually rotated the screws to ensure smooth operation. Preventive Action: Coated locking screws with anti-corrosion lubricant monthly and covered the BOP during idle periods to prevent saltwater exposure.
8. FAQ (Frequently Asked Questions)
Question | Answer |
Which API standards do the FZ35-35U series BOPs comply with? | The BOPs comply with API Spec 16A (Wellhead and Christmas Tree Equipment), API RP 53 (Well Control Systems), and API Spec 6A (Wellhead Equipment). All critical components meet NACE MR0175 standards for corrosion resistance. |
Can the FZ35-35U use both pipe rams and shear rams interchangeably? | Yes. The modular ram design allows interchange between pipe, shear, and variable bore rams. Ensure the ram model matches the BOP size (35MPa, 13 5/8" bore) and follow the manufacturer’s ram change procedure. |
What is the service life of the primary seals? | Primary seals (O-rings, U-seals) have a service life of 6 months or 500 operating hours, whichever comes first. In harsh environments (sand, saltwater), this may be reduced to 3 months—regular inspections are critical. |
Is the tandem booster compatible with both single and double ram models? | Yes. The tandem booster assembly (part 2C31.03.00) can be retrofitted to both FZ35-35U (single) and 2FZ35-35U (double) models, increasing the closing ratio to 23.3:1 for heavy-duty applications. |
What type of grease should be used for the secondary sealing system? | Only use EM-09-01 secondary seal grease, as it is formulated to withstand high pressure (up to 35MPa) and compatibility with primary seals. Using non-specified grease may cause seal degradation and leakage. |
9. Procurement Guidance & Conclusion
The FZ35-35U and 2FZ35-35U Ram-Type BOPs are API-compliant, reliable well control solutions tailored to medium-pressure drilling operations, addressing the safety and efficiency needs of E&P companies, drilling contractors, and well service providers. Their robust design, modular ram system, and dual sealing mechanisms ensure compliance with global HSE standards and industry best practices, minimizing blowout risks and operational downtime.
When procuring, verify that all components include API certification marks and comply with local regulatory requirements (e.g., GB/T 22513, OSHA well control standards). Prioritize suppliers offering comprehensive technical documentation, one-year recommended spare parts kits, and on-site maintenance training. The recommended spare parts list (included in the technical data) ensures critical components are available for quick replacement, reducing downtime.
For operations requiring reliable well control, the FZ35-35U series delivers proven performance backed by rigorous testing, API certification, and real-world field validation. We invite you to consult our technical team to customize ram configurations (pipe, shear, VBR) to your specific wellbore requirements, discuss procurement terms, and access detailed performance data and client references. Invest in a well control solution that aligns with industry standards and safeguards your personnel, equipment, and environment.
contact us :
Emeil: [email protected] whatsapp: +86 15275658619
Should you have any purchase intentions, please contact us – we will offer you our most favorable price.