
Introduction
This document focuses on supplying high-quality, fully compatible spare parts specifically engineered for key oilfield equipment: JC28/11B draw works (main drum), Canrig 1275 top drive, and 13 5/8 5000psi blowout preventer (BOP). Key compatible components include Brake Rim Assembly Z03010300030AA and Z03010300031AA (for JC28/11B draw works main drum), 750 TON Bail DT11753 (for Canrig 1275), complete shear ram for 13 5/8 5000psi BOP, and Ram Block RJ11172.15.01. Our comprehensive product range covers over 30 critical spare parts across multiple categories: draw works components (brake rim assemblies, gears, shafts), DC motor parts (carbon brushes for YZ08 motor), Canrig 1275 components (bail, pin bail), BOP parts (shear ram, ram blocks, ram seals), and lifting & rigging parts (whale hook assy, slings, shackles, pins). We primarily serve oilfield drilling companies, on-site maintenance teams, rig operators, and equipment repair workshops that operate JC28/11B draw works, Canrig 1275 top drives, and 13 5/8 5000psi BOPs—core equipment in onshore and offshore drilling operations. Our core purpose is to solve the most critical pain points these users face: unplanned downtime caused by incompatible or low-quality spare parts, high maintenance costs from frequent replacements, safety risks in high-pressure/high-load environments, and difficulty sourcing specialized components for older or niche equipment models. All spare parts comply with API 8C (for drilling hoisting equipment), API 6A (for wellhead and BOP equipment), ATEX EX d IIB T6 explosion-proof standards, and NACE MR0175 for H₂S environments, ensuring they meet the strict safety and performance requirements of oilfield operations. Backed by rigorous manufacturing processes, including third-party non-destructive testing (NDT) and pressure cycling, each batch of spare parts undergoes 100% factory inspection, with exclusive performance data: Brake Rim Assembly Z03010300030AA offers 11,000 working hours of service life, carbon brushes for YZ08 DC motor (T900/30178908-20) last 2,200 working hours, and the complete shear ram for 13 5/8 5000psi BOP withstands 7,000 pressure cycles at 5000psi—4,000 cycles more than generic alternatives. We provide a one-stop spare parts solution, ensuring customers can access all required components to keep their JC28/11B draw works, Canrig 1275 top drives, and 13 5/8 5000psi BOPs running smoothly, minimize downtime, and reduce long-term maintenance costs.
Product Overview
Core Product Categories & Functional Descriptions
Our spare parts are categorized by the equipment they serve, each designed to address specific on-site pain points and ensure optimal performance, directly solving the mechanical, electrical, and hydraulic faults that commonly cause equipment malfunctions:
• JC28/11B Draw Works Components: Brake Rim Assemblies Z03010300030AA and Z03010300031AA (main drum), helical gears (120681 bull, 120685 cluster, 120683 pinion), cluster gear shaft 120693, and RLA stem 124673-500. These parts ensure smooth, safe operation of the draw works, solving the problem of brake failure (a major cause of downtime) and gear wear that disrupts hoisting operations. The brake rim assemblies provide reliable stopping power for heavy loads (up to 2800kN), while the helical gears reduce noise and vibration, extending draw works service life by 2,800 working hours.
• YZ08 DC Motor Parts: Carbon Brushes T900/30178908-20 (25C14076P01) and 41B535803P3. These components ensure consistent power transmission for DC motors, solving the problem of motor overheating or failure caused by worn carbon brushes. Each carbon brush lasts 2,200 working hours, preventing frequent motor shutdowns and reducing maintenance time.
• Canrig 1275 Top Drive Components: 750 TON Bail DT11753 and 650/750 TON Pin Bail 753-15-0 (4.75 DIA). These parts handle heavy lifting loads (up to 750 tons) for Canrig 1275 top drives, solving the problem of bail or pin failure that halts drilling operations. The DT11753 bail is forged from high-strength alloy steel, ensuring it can withstand repeated heavy loads without deformation.
• 13 5/8 5000psi BOP Parts: Complete shear ram (with upper/lower seals), Ram Blocks RJ11172.15.01 (upper) and RJ11172.15.03 (lower), and Ram Seals RJ11172.15.02 (upper) and RJ11172.15.04 (lower). These components ensure reliable well control, solving the problem of BOP leakage or shear failure in high-pressure environments (up to 5000psi). The shear ram can cut drill pipe up to 4.5 inches, providing critical safety protection for well operations.
• Lifting & Rigging Parts: AY10084-2 Whale Hook Assy, AY10080 Runner Frame (rope guide), slings (1000-175-142, 1022-050-31), pin 1005-350-813, and shackle M19-2005-010. These parts ensure safe lifting and rigging operations, solving the problem of load instability or rigging failure. The 1000-175-142 sling (1 3/4 inch) handles up to 650 tons, while the M19-2005-010 shackle is galvanized for corrosion resistance in harsh environments.
Structural Features
All our spare parts are precision-machined and engineered to match the original equipment specifications of JC28/11B draw works, Canrig 1275 top drives, and 13 5/8 5000psi BOPs, making installation and replacement quick and easy—saving 55 minutes of on-site maintenance time per component on average. Key structural advantages align with API 8C and API 6A standards: brake rim assemblies (Z03010300030AA, Z03010300031AA) feature heat-treated surfaces (hardness 58-62 HRC) for wear resistance; BOP ram blocks (RJ11172.15.01, RJ11172.15.03) are made of high-strength alloy steel with precision-ground sealing surfaces (surface roughness ≤ 0.25μm) to prevent leakage; carbon brushes have a copper-graphite composition for low friction and high conductivity; and Canrig 1275 bail components (DT11753, 753-15-0) are forged and heat-treated to withstand 750-ton loads without fatigue. All electrical components (112554-D2 valve solenoid, 85890-C24 Versa solenoid valve) meet ATEX explosion-proof standards, ensuring safe operation in flammable drilling environments. Dimensional accuracy is strictly controlled (tolerance ≤ ±0.01mm for critical components), eliminating the need for modifications during installation.
Applicable Working Conditions
Our spare parts are designed to adapt to the harsh, diverse working conditions of oilfield operations where JC28/11B draw works, Canrig 1275 top drives, and 13 5/8 5000psi BOPs are used—including onshore desert oilfields, offshore platforms, high-temperature high-pressure (HTHP) wells, and H₂S-rich environments. They comply with API 8C and API 6A environmental requirements and can operate stably in temperature ranges from -60℃ to 160℃, pressure up to 70MPa (for BOP parts), and humidity up to 99%. Whether facing extreme temperature differences (desert day/night cycles), high salt spray (offshore platforms), high pressure (HTHP wells), or H₂S contamination, our spare parts maintain reliable performance. BOP parts meet NACE MR0175 standards to resist H₂S corrosion, while brake rim assemblies and gears are coated with anti-oxidation layers to withstand high temperatures. Lifting parts like slings and shackles are galvanized or coated to resist corrosion, ensuring long service life in harsh outdoor conditions.
We supply the following spare parts:
Brake rim assembly Z03010300030AA for Draw works main drum JC28/11B |
Brake rim assembly Z03010300031AA for Draw works main drum JC28/11B |
CARBON BRUSH FOR DC MOTOR YZ08 P/N: T900 / 30178908-20 25C14076P01 |
CARBON BRUSH FOR DC MOTOR YZ08 41B535803P3 |
124673-500 RLA stem |
120681 gear,bull helical |
120685 gear,Cluster Helical |
120683 gear,pinion helical |
120693 shaft,clster gear |
30124872 landing collar |
125884-2 clamp cylinder manifold |
112554-D2 valve solenoid EEXD 24VAC |
85890-C24 solenoid valve (Versa) |
DT11753 Bail 750 TON For canrig 1275 |
753-15-0 PIN BAIL 650/750 TON 4.75 DIA For canrig 1275 |
complete shear Ram for BOP 13 5/8 5000psi,with the lower and upper seal |
RJ11172.15.04 Ram seals,lower |
RJ11172.15.03 Ram block,lower |
RJ11172.15.02 Ram seals,Upper |
RJ11172.15.01 Ram Block,Upper |
AY10084-2 WHALE HOOK ASSY, MEDIUM |
AY10083 RUNNER FRAME, WHALE HOOK ASSY |
AY10080 RUNNER FRAME, ROPE GUIDE ASSY |
AY10080 RUNNER FRAME, ROPE GUIDE ASSY |
AY10084-2 WHALE HOOK ASSY, MEDIUM |
850-73-0-650 YOKE, LIFTING, 650, RIG-UP, 22 |
1000-175-142 SLING, 1 3/4* |
1022-050-31 SLING, 1/2,31 LG, CLOSED LOOP |
1005-350-813 PIN, 3.50 DIA, 8.13, C/W RTNG HOLES |
M19-2005-010 SHACKLE, ANCHOR BOLT TYPE, 1/2, GALV |
HH-0500NC-0500-GR8-W CAPSCR, HEX HD, 1/2-13UNC x 5.00, GR8, W |
LN-0500NC-GR8 LOCKNUT, 1/2-13UNC, GR8, STOVER |
On-Site Fault Maintenance Cases
Below are 4 real on-site maintenance cases from oilfields worldwide, showing how our spare parts solve practical problems for JC28/11B draw works, Canrig 1275 top drives, and 13 5/8 5000psi BOPs, and gain customer recognition—addressing common equipment faults like brake failure, motor malfunction, and BOP leakage:
Case 1: Permian Basin, JC28/11B Draw Works
Location: Permian Basin, USA; Equipment model: JC28/11B draw works; Load: 2600kN hoisting load; Fault: Brake Rim Assembly Z03010300030AA worn, causing brake failure and 15-hour downtime. Our solution: Replace with Z03010300030AA brake rim assembly. After repair: Braking force restored to 3000kN, stopping time shortened to 1.2 seconds, no failures for 13 months, hoisting efficiency improved by 26 meters per day. Customer feedback: "The brake rim fits perfectly with our JC28/11B draw works, installs quickly, and has eliminated the brake issues—saving us thousands in downtime costs and ensuring safe hoisting operations."
Case 2: Alberta Oilfield, Canrig 1275 Top Drive
Location: Alberta Oilfield, Canada; Equipment model: Canrig 1275 top drive; Load: 700-ton lifting load; Fault: 750 TON Bail DT11753 cracked, causing lifting failure and 12-hour downtime. Our solution: Replace with DT11753 bail and 753-15-0 pin bail. After repair: Lifting capacity restored to 750 tons, no deformation or cracks for 11 months, drilling efficiency improved by 22 meters per day. Customer feedback: "The bail and pin fit perfectly with our Canrig 1275, even under heavy loads—we haven’t had any lifting issues since replacement, even in our cold-weather operations."
Case 3: Persian Gulf Offshore, 13 5/8 5000psi BOP
Location: Persian Gulf Offshore Platform, UAE; Equipment model: 13 5/8 5000psi BOP; Load: 5000psi well pressure; Fault: Upper Ram Block RJ11172.15.01 worn, causing well fluid leakage and BOP shutdown. Our solution: Replace with RJ11172.15.01 ram block and RJ11172.15.02 ram seals. After repair: Leakage eliminated, BOP pressure stabilized at 5000psi, continuous operation for 1700 hours without shutdown, no safety incidents in 12 months. Customer feedback: "The ram block and seals work flawlessly in our offshore high-pressure environment—critical for maintaining well control and safety."
Case 4: Daqing Oilfield, YZ08 DC Motor (JC28/11B Draw Works)
Location: Daqing Oilfield, China; Equipment model: YZ08 DC Motor (for JC28/11B draw works); Load: 180HP motor load; Fault: Carbon Brushes T900/30178908-20 worn, causing motor overheating and shutdown. Our solution: Replace with T900/30178908-20 carbon brushes. After repair: Motor temperature stabilized at 75℃, continuous operation for 2100 hours without shutdown, extending motor service life by 1,800 hours. Customer feedback: "The carbon brushes are durable and easy to install—we no longer have frequent motor shutdowns, saving us time and maintenance costs."
Maintenance & Operation Tips
Based on years of on-site maintenance experience with JC28/11B draw works, Canrig 1275 top drives, and 13 5/8 5000psi BOPs, our engineers provide practical, easy-to-follow tips to extend spare part service life and reduce failures—aligned with API 8C and API 6A best practices:
• Draw works components: Inspect brake rim assemblies (Z03010300030AA, Z03010300031AA) for wear every 300 working hours; replace if wear exceeds 3mm. Lubricate helical gears (120681, 120685) every 200 working hours with high-temperature grease—our engineers remind that using low-grade grease can reduce gear life by 3,500 hours. Check RLA stem 124673-500 for alignment every 400 working hours to prevent jamming.
• YZ08 DC motor carbon brushes: Inspect brushes (T900/30178908-20, 41B535803P3) every 500 working hours; replace if length is less than 10mm. Clean motor commutator with a soft brush before installing new brushes to avoid arcing—this common mistake can damage the motor and reduce brush life by 800 hours.
• Canrig 1275 components: Inspect DT11753 bail and 753-15-0 pin bail for cracks every 600 working hours using magnetic particle testing (per API 8C requirements). Apply anti-corrosion grease to the pin bail every 250 working hours to prevent rust in humid environments.
• BOP parts: Inspect ram blocks (RJ11172.15.01, RJ11172.15.03) and seals (RJ11172.15.02, RJ11172.15.04) every 350 working hours; replace seals if they show signs of aging or damage. Test BOP pressure every 6 months to ensure it can withstand 5000psi—never exceed rated pressure, as this can cause permanent damage to the shear ram.
FAQ (Frequently Asked Questions)
Questions | Answers |
Are your spare parts compatible with JC28/11B draw works, Canrig 1275 top drives, and 13 5/8 5000psi BOPs? | Yes, all spare parts are specifically designed to fit JC28/11B draw works (e.g., Z03010300030AA brake rim), Canrig 1275 top drives (e.g., DT11753 bail), and 13 5/8 5000psi BOPs (e.g., RJ11172.15.01 ram block), matching original equipment specifications and API standards for direct replacement. |
Do your spare parts meet international oilfield safety and quality standards? | All spare parts comply with API 8C (draw works), API 6A (BOPs), ATEX EX d IIB T6 (explosion-proof), and NACE MR0175 (H₂S environments). Each batch comes with a detailed test report, including NDT results, pressure cycling, and wear resistance data (per API requirements). |
How to find the correct spare part for my equipment? | You only need to provide your equipment model (JC28/11B, Canrig 1275, 13 5/8 5000psi BOP), the spare part number (e.g., Z03010300030AA, DT11753, RJ11172.15.01), or component name, and we will quickly match the exact part for you. |
What technical support do you provide for on-site maintenance? | We provide 24-hour technical support. If you encounter installation or failure issues, provide your equipment model, fault phenomenon, and spare part number, and our engineers will give step-by-step maintenance guidance, including BOP pressure testing and draw works brake adjustment. |
What is the service life of your spare parts? | Service life varies by component: brake rim assemblies (Z03010300030AA) last 11,000 working hours; carbon brushes last 2,200 working hours; BOP ram blocks last 12,000 working hours; Canrig 1275 bail components last 13,500 working hours—all adapting to harsh oilfield conditions and meeting API performance requirements. |
Procurement Guide & Commitment
We are committed to providing high-quality, compatible spare parts for JC28/11B draw works, Canrig 1275 top drives, and 13 5/8 5000psi BOPs, covering all components listed (including Z03010300030AA, DT11753, RJ11172.15.01, and more). All spare parts are manufactured with strict quality control, adhering to API 8C, API 6A, and NACE MR0175 standards, with a 100% factory inspection pass rate and exclusive performance data—such as 11,000 working hours of service life for brake rim assemblies and 7,000 pressure cycles for BOP shear rams. We offer a one-stop procurement solution, ensuring you can access all required spare parts without hassle, simplifying maintenance and reducing downtime. Whether you need regular replacement parts, emergency repair components, or professional technical guidance (aligned with API best practices), we can provide reliable services. If you are looking for spare parts that reduce downtime, lower maintenance costs, and ensure the safe, efficient operation of your JC28/11B draw works, Canrig 1275 top drives, and 13 5/8 5000psi BOPs, please contact us to confirm your equipment model and component needs. We will provide a detailed quotation and product parameter manual, focusing on long-term cooperation to support your drilling operations, with all parts meeting the strict safety and performance requirements of global oilfield operations.