1. Product Overview & Core Operational Value
1.1 Matched Equipment & Target User Refined Demands
This comprehensive lineup of precision industrial spare parts is professionally manufactured and supplied exclusively for Gara Altyn JC70B drilling rig drawwork systems, covering core wearable components, power transmission parts, hydraulic and pneumatic control assemblies, pipeline accessories and fastening standard parts. These components precisely meet the daily maintenance, seasonal overhaul, emergency fault replacement and system calibration needs of onshore oilfield drilling teams, drawwork mechanical technicians and hydraulic system maintenance personnel. The product set solves common field pain points including bearing abrasion clearance enlargement, brake system failure, hydraulic oil leakage, pneumatic pipeline blockage and transmission chain jitter during long-cycle heavy-load drilling operations.
1.2 Authoritative Compliance & Exclusive Field Verified Data
All finished components comply with API 7K drilling machinery safety standards and national GB/T industrial standard specifications, fully meeting Gara Altyn JC70B drawwork operational certification requirements. Validated by 4000-hour continuous field endurance testing and third-party bench calibration, matched spherical roller bearings maintain stable rotary precision without excessive clearance for 3500 consecutive working hours; customized oil seals and felt rings achieve zero medium leakage under rated operating pressure; hydraulic brake cylinders sustain accurate opening and closing response through 3800 hours of high-frequency cyclic braking. Every part undergoes pressure resistance testing, dimensional tolerance inspection and material fatigue detection to form unified production procurement benchmarks and professional on-site fault-solving technical references.
2. Product Introduction & Functional Description
2.1 Core Product Composition
This integrated spare parts portfolio covers five core functional modules: Transmission bearing components including 32240, 22244CA/W33, 23048CA/W33, NU1048 and 6040 series high-load roller bearings; drawwork brake system parts consisting of PS-70-01-03A brake pads, FDR disc brakes, KG-80 normally open hydraulic cylinders, BG-80 normally closed hydraulic cylinders and emergency brake devices; hydraulic power assemblies with WBZ-40 and WBZ-63 oil pump assemblies, QGA series telescopic cylinders and QF528 mandril valves; pneumatic and pipeline systems including LT700/135 air tube clutches, 3/4″-M22×1.5 tee joints, multi-spec air and water pipe assemblies; auxiliary structural parts covering spacer sleeves, sprockets, adjusting washer sets, copper washers, O-rings, rope clamps and oil guiding ring assemblies.
2.2 Practical Working Functions
High-load roller bearings support stable rotary operation of JC70B drawwork main drum and transmission shafts, reducing rotary friction and avoiding shaft deflection caused by abrasion. Disc brake and hydraulic cylinder assemblies provide reliable normal braking and emergency locking protection to prevent drilling tool sliding risks. Oil pump and cylinder assemblies supply continuous stable hydraulic power for drawwork speed regulation and braking actions. Pneumatic clutch and pipeline assemblies ensure sensitive power switching and unobstructed gas circuit transmission. Sealing and washer accessories block hydraulic oil and gas leakage, while structural spacer and adjusting parts calibrate assembly clearance to maintain overall equipment operational stability.
3. Structural Features & Applicable Working Conditions
3.1 Unique Structural Advantages
All bearings adopt W33 oil groove design with enhanced lubrication performance, effectively solving bearing burnout and rapid abrasion defects under long-term heavy load. Brake pads and disc brakes adopt high-friction wear-resistant materials with stable friction coefficient, avoiding braking force attenuation after frequent use. Composite oil seals and felt rings feature dual dust-proof and leakage-proof performance, adapting to complex dusty oilfield environments. Sprocket and chain transmission parts adopt precision tooth profile machining to ensure tight meshing and low jitter. All standard fasteners strictly follow GB/T national standards to guarantee assembly accuracy and structural stability.
3.2 Adaptable Working Scenarios
This series of spare parts is specially developed for Gara Altyn JC70B onshore drilling rig drawwork systems, adapting to medium and deep well high-pressure drilling, long-cycle continuous heavy-load operation and frequent start-stop braking working conditions. Components stably operate in ambient temperatures ranging from -40℃ to 85℃, resisting field dust accumulation, mud erosion and persistent mechanical vibration. All parts support 24-hour uninterrupted cyclic operation of drawwork transmission, braking and hydraulic control systems.
4. Engineer Practical Maintenance Suggestions
Summarized from front-line oilfield overhaul experience, standardized maintenance effectively reduces system failure frequency: Replace bearing lubricating grease and inspect clearance every 650 working hours to avoid rotary jitter; renew brake pads and sealing assemblies every 700 working hours to maintain stable braking performance; clean oil pump filter elements and pipeline impurities regularly to prevent hydraulic blockage; calibrate hydraulic cylinder stroke and pneumatic clutch sensitivity after each heavy-load drilling cycle. Avoid mixed installation of non-standard bearings and sealing parts; conduct full hydraulic pressure holding testing after component replacement; never adjust brake system pressure parameters without professional calibration.
We supply the following spare parts:
Gara Altyn rig Drawwork |
BEARING 32240 (200 X 360 X 58) |
Bearing 22244CA/W33 (220x400x108) |
SEAL OIL PD220 X 260 X 18 |
Water pipeline Assy for DRAWWORKS Model:JC70B,P/N 700105.02.02.00; |
Adjusting washer sets for DRAWWORKS Model:JC70B,P/N 700105.03.2 |
SEALS WASHER; Part Number: 700105.02.09. |
WASHER COPPER; Part Number: 700105.02.58. |
Spacer sleeve L=145 for DRAWWORKS Model:JC70B,P/N 700105.02.11; MFG:. |
Sprocket Z=98 P=50.8 for DRAWWORKS Model:JC70B,P/N 700105.02.41 |
AIR PIPE ASSEMBLY FOR AIR INSTALLATION DRAWWORKS MODEL JC70B ; Part Number: 700105.02.31.00; . |
TEE R 3/4″ – M22 X 1.5 FOR AIR INSTALLATION DRAWWORKS MODEL JC70B ; Part Number: 700105.02.10; . |
WASHER FOR AIR INSTALLATION DRAWWORKS MODEL JC70B ; Part Number: 700105.02.52; . |
SPACER SLEEVE; Part Number: 700105.02.29. |
Oil rings Assy for DRAWWORKS Model:JC70B,P/N 700105.03.22.00; . |
INSTRUMENT DEVICE WATER GAS; Part Number: 700105.02.51.00 |
FELT RING; Part Number: 700105.02.19 |
FELT RING; Part Number: 700105.04.20 |
DISC BRAKE FDR DRAWWORKS- Part Number: 700105.09 |
Bearing 22244C/W33:(220x400x108) |
Roller Bearing 222244CA/W33/C3 (22 |
Roller Bearing 23048CA/W33 (240×3) |
Roller Bearing NU1048 (240x360x56) |
Oil Pump assembly ; DRS & WBZ-63 |
Cylinder; DRS & QGA50X25G |
Cylinder; DRS & QGA100X50-S |
Spring washer 180×220×15 for DRAWWORKS Model:JC70B,P/N D7-1-67; . |
Adjustment washer for DRAWWORKS Model:JC70B,P/N 700104.02.09; . |
SEAL WASHER, FOR DRAWWORKS JC70B; 700105.04.18 |
SEAL WASHER, FOR DRAWWORKS JC70B; 700105.04.25 |
WASHER, FOR DRAWWORKS JC70B; 700105.03.25 |
NUT, FOR DRAWWORKS JC70B; Dimension: M20; GB/T6170-2000 |
BOLT, FOR DRAWWORKS JC70B; Dimension: M20X90; GB/T5782-2000 |
NOZZLE, FOR DRAWWORKS JC70B; CD-20 |
CLAMP, ROPE, FOR DRAWWORKS JC70B, 38KT; GB5976-8 |
FORK, ASSEMBLY, FOR DRAWWORKS JC70B; 401113.05.26.00 |
VALVE, MANDRIL, FOR DRAWWORKS JC70B; QF528 |
SEAT, WIRE ROPE, FOR DRAWWORKS JC70B; 700105.02.66 |
AIR PIPE ASSEMBLY FOR AIR INSTALLATION DRAWWORKS MODEL JC70B ; Part Number: CD-01.00; |
HOSE, C81-, FOR DRAWWORKS JC70B; Dimension: M16X1.5 |
Bearing 6040 (200X310X51) for DRAWWORKS Model:JC70B,P/N GB/T276-94 |
O-ring 1050×8.6 for DRAWWORKS Model:JC70B,P/N 105.08.40.05; . |
Oil Guiding Ring Assembly for DRAWWORKS Model:JC70B,P/N 401113.05.34.00;. |
FELT, FOR DRAWWORKS JC70B; 700104.01.30 |
PUMP, OIL, ASSEMBLY, FOR DRAWWORKS JC70B; WBZ-40 |
O-RING, FOR DRAWWORKS JC70B; Dimension: 470 X 8.6; 105.08.50.02 |
U-CLAMP; 700105.02.67 |
DRUM ASSY FOR DRAWWORKS; 700105.02.20.00 |
MAIN DRUM ASSY INCLUDED DISC BRAKE; 700105.00 |
EMERGENCY DEVICE FOR BRAKE SYSTEM; 700105.06.00 |
DRAW WORKS SPEED CONTROLER AND BRAKE ELECTRONIC DRIVERS TYPE E-ME-AC-01F |
PAD; P/N-PS-70-01-03A |
NORMAL OPEN ARRESTOR P/N KG-80 (Long open brake (hydraulic cylinder brake) |
NORMAL CLOSE ARRESTOR P/N BG-80((hydraulic cylinder brake |
One way swivel; P/N-XJ – L15 |
Air tube clutch; P/N-LT700/135 |
5. On-Site Field Maintenance Cases
Case 1: Turkmenistan Gara Altyn Oilfield JC70B Bearing Jitter Fault
Location: Gara Altyn Onshore Drilling Site; Equipment Model: JC70B Drawwork Transmission System; Working Load: 270-ton cyclic drilling load; Fault Data: Worn 22244CA/W33 bearing caused excessive clearance and rotary jitter; Repair Plan: Replace matched high-load roller bearing and lubricating grease; Restoration Index: Drum rotation smooth with zero jitter and stable transmission precision; Customer Feedback: Eliminated abnormal vibration faults and extended transmission system service life.
Case 2: Tarim Oilfield JC70B Braking Force Insufficiency Fault
Location: Tarim Medium-Deep Well Drilling Site; Equipment Model: JC70B Drawwork Disc Brake System; Working Load: 260-ton continuous operation load; Fault Data: Aging brake pads and oil seal leakage caused insufficient braking torque; Repair Plan: Replace PS-70-01-03A brake pads and PD220×260×18 oil seal; Restoration Index: Braking torque fully restored to rated standard with zero oil leakage; Customer Feedback: Solved slow braking response and hidden safety hazards effectively.
Case 3: Ordos Oilfield JC70B Hydraulic Power Abnormality Fault
Location: Ordos Conventional Oilfield Site; Equipment Model: JC70B Drawwork WBZ-40 Oil Pump System; Working Load: 250-ton heavy hoisting load; Fault Data: Blocked pump body and aging internal seals caused insufficient oil supply pressure; Repair Plan: Replace oil pump assembly and matched sealing accessories; Restoration Index: Hydraulic oil supply pressure stable and continuous; Customer Feedback: Eliminated hydraulic action delay faults and improved operational efficiency.
Case 4: Xinjiang Oilfield JC70B Pneumatic Clutch Failure Fault
Location: Xinjiang Heavy-Duty Drilling Site; Equipment Model: JC70B LT700/135 Air Tube Clutch; Working Load: 240-ton stable drilling load; Fault Data: Aging air tube and sealing ring caused insufficient inflation and clutch slipping; Repair Plan: Replace clutch air tube and full set of O-rings; Restoration Index: Clutch engagement sensitive and firm with zero slipping; Customer Feedback: Restored drawwork power transmission stability completely.
6. Product FAQ
Question | Professional Answer |
What equipment do these spare parts adapt to? | All bearings, brake parts, hydraulic and pneumatic components are professionally customized and fully compatible with Gara Altyn JC70B model drilling rig drawwork systems. |
What causes JC70B drawwork rotary jitter? | Worn bearings, enlarged assembly clearance and insufficient lubrication are the main causes. Timely replacement of aging bearings and standardized lubrication can solve jitter issues. |
How to maintain stable braking performance? | Regularly replace worn brake pads and aging oil seals, inspect hydraulic cylinder operating status, and conduct periodic braking performance calibration. |
What standards certify these JC70B drawwork parts? | All components comply with API 7K drilling machinery standards and GB/T national standard specifications, passing strict pressure resistance, wear and fatigue testing for harsh oilfield environments. |
What is the core advantage of matched W33 bearings? | W33 oil groove structure enhances grease circulation, maintaining stable lubrication effect for 3500 working hours and effectively reducing high-load bearing abrasion. |
7. Technical & Procurement Guidance
This full range of Gara Altyn JC70B drawwork spare parts is manufactured under rigorous industrial quality control systems, equipped with complete factory performance test reports, dimensional calibration certificates and material quality verification files, providing standardized procurement screening criteria and professional on-site technical fault-solving references for drilling engineering teams. Every component is optimized to resolve common field faults including transmission jitter, braking failure, hydraulic pressure instability and pneumatic system malfunction, effectively lowering unplanned equipment downtime and daily maintenance costs. Featuring precise dimensional compatibility, high pressure resistance, wear resistance and harsh environment adaptability, these modular spare parts support full-cycle refined overhaul, daily calibration and emergency repair of JC70B drawwork systems. Professional-grade manufacturing processes ensure full compatibility with original equipment, allowing engineering teams to select targeted accessories based on actual equipment operating status and field working conditions to sustain long-term stable and efficient operation of drilling rig drawwork systems.