30 Aug 2026

FY50 BOP Handling System Components, ZKYZ-630II Explosion-proof Hydraulic Electric Parts

1. Core Application Orientation & Segmented User Demand

1.1 Core Usage & Matched Host Equipment Model

This matched batch of FY50 BOP mechanical load components, ZKYZ630I/630II explosion-proof hydraulic electric accessories, BY series oil pipeline assemblies, standard transmission coupling and valve control parts is precision fabricated exclusively for FY50-00 full BOP handling system and ZKYZ-630II integrated explosion-proof electric control cabinet, compatible with 2000HP-3300HP onshore explosion-proof drilling BOP hoisting units with full hydraulic plunger power loop. All components comply with API 16A BOP handling machinery industrial specification, ATEX Ex d IIB T4 explosion-proof component certification, ISO 1436 high-pressure rubber hose standard and GB/T 276 rolling bearing national implementation standard. Machining and assembly workshops own ISO 9001 electromechanical integrated manufacturing accreditation and SGS cyclic hydraulic pressure impact testing qualification, supplying traceable OEM interchange spare parts for nonstop cyclic BOP clamping, lifting and positioning operation in oilfield hazardous working zones. Target segmented users cover Zone1 inland drilling site maintenance teams, oilfield BOP equipment centralized procurement departments, explosion-proof electric cabinet overhaul contractors, hydraulic loop commissioning technicians and regional hazardous area rig spare part inventory suppliers. Core segmented user demands include zero-modification original equipment installation, stable manual hydraulic pressure regulation, anti-misoperation explosion-proof electric switching, real-time hydraulic oil temperature-liquid level linkage monitoring, leak-free high-pressure fluid conveying, and unified matching spare part procurement to solve BOP block offset deviation, hydraulic loop pressure runaway, explosion-proof circuit switching failure, pipeline oil leakage and motor transmission vibration common onsite electromechanical faults.

1.2 Pre-positioned On-site BOP Working Pain Points Solved

 Generic aftermarket lateral driving block sets produce assembly offset exceeding 0.40mm under 235kN rated BOP hoisting load, causing uneven force on FY50 suspending assembly and abnormal structural torsion

 Ordinary transfer switches lack anti-interference explosion-proof structure, triggering random circuit mis-switching under oilfield electromagnetic field interference, affecting ZKYZ-630II valve group linkage action

 Universal high-pressure hose assemblies develop interlayer delamination after 480 continuous hydraulic working hours, resulting in micro leakage at pipeline joint under 28MPa system working pressure

 Non-matched star delta starters generate unstable starting current, causing frequent overload tripping of ZKYZ630II oil pump motor assembly under low ambient temperature startup condition

2. Standardized Full Product Technical Introduction

2.1 Complete Product Portfolio Overview

This spare part lineup covers seven core functional modules: FY50 serial BOP mechanical components including driving block group, dual lateral block groups and integral suspending assembly; ZKYZ-630II explosion-proof electric control parts covering QJX4-50D star delta starter, multi-pole circuit breakers, transfer switches, explosion-proof indicator lights and graded fuse assemblies; ZKYZ hydraulic valve and fluid control units including overflow valve, cut-off valve, one-way valve, ball valve and check valve; BY series oil suction, drainage and vent pipeline assemblies matched with LQ-33 hydraulic cooler; NL2YA buffer coupling, standardized reducer bearings and anti-vibration motor seat transmission connecting parts; SZY2-22/3 tubular heater, DY-2000 intelligent temperature controller and liquid level monitoring linkage components; high-pressure hose assemblies, explosion-proof plug sockets, threaded adapters and pipe frame fixing accessories. High-frequency searched procurement keywords include FY50-00 BOP handling general assembly, ZKYZ-630II electric control cabinet assembly, NL2YA19X40/YA20X40 coupling and QJX4-50D star delta starter. Exclusive third-party oilfield hazardous zone lab verified data: this OEM matched component set extends FY50 BOP system integrated overhaul cycle by 1190 working hours, and cuts hydraulic-electric linkage fault debugging workload by 7 working hours per quarterly routine maintenance compared with modified general industrial aftermarket parts.

2.2 Core Functional Description

All components realize coordinated linkage for FY50 BOP full-process hoisting operation, ZKYZ630II explosion-proof electric logic control, closed-loop hydraulic power regulation, hydraulic medium temperature-liquid level monitoring, pipeline fluid on-off control and buffer power transmission. FY50 serial block assemblies bear horizontal positioning and vertical traction load for BOP body; manual variable plunger pump provides adjustable hydraulic source for standby loop; complete valve groups control hydraulic pressure unloading, fluid one-way circulation and pipeline emergency cut-off; explosion-proof electric components realize motor soft startup, circuit overload protection, manual/automatic signal switching and running state indication; temperature heating and monitoring assemblies stabilize hydraulic oil viscosity in extreme ambient temperature; graded fuse holders and thermal relays build multi-stage circuit safety protection; NL2YA coupling eliminates oil pump motor transmission vibration; high-pressure hose assemblies and threaded adapters build sealed high-pressure oil conveying loop; pipe frame assembly standardizes pipeline layout to reduce vibration friction loss.

2.3 Optimized Structural Characteristics

FY50 block assembly adopts integral cast alloy body with precision milling positioning datum; ZKYZ explosion-proof electric parts adopt flameproof sealed shell compliant with Zone1 gas isolation standard; QJX4-50D star delta starter adopts integrated current limiting module for stable motor startup; hydraulic valve body adopts forged integral flow passage to resist high-pressure deformation; NL2YA coupling adopts oil-resistant elastic inner ring for damping transmission; high-pressure hose adopts four-layer steel wire braided reinforcement structure; all threaded adapters adopt precision taper thread for anti-loose sealing; explosion-proof knob switch owns anti-splash protective outer cover. On-site optimized design: unified mounting hole benchmark for ZKYZ cabinet internal parts, laser-etched pressure scale on valve surface, quick-clamp structure for pipe frame assembly to lower onsite replacement difficulty.

2.4 Adaptable Oilfield Working Conditions

Adapt ambient operating temperature ranging from -32℃ to 83℃; fit hydrocarbon mixed explosive atmosphere, saline mud corrosion, 24-hour variable-load reciprocating BOP hoisting working environments; stable operation under 29MPa rated hydraulic system pressure and 235kN maximum BOP single lifting load; compatible with ISO VG68 anti-flame hydraulic oil; applicable for inland Zone1 explosion-prone drilling and BOP maintenance operation yards.

2.5 Engineer Verified Maintenance Rules & On-site Avoidance Tips

Clean ZKYZ630II-W1200 oil suction filter impurity every 330 continuous BOP lifting hours; calibrate DY-2000 temperature controller set value every 710 cyclic operation hours; check explosion-proof plug sealing gasket integrity before daily equipment startup; critical avoidance tip: do not mix install 3A,6A graded fuse cores arbitrarily, which will break circuit protection threshold and damage internal explosion-proof electrical modules.

We supply the following spare parts:

Coupling NL2YA19X40/YA20X40

Explosion-proof tubular heater SZY2-22/3

DC 24V power supply SP-75-24/3.2A

ZKYZ630II-W2100 Ball valve g3/4

ZKYZ-630II-W3100 Auxiliary Contact Group

ZKYZ6300II-W0100 manual variable plunger pump

FY50-04.00 Driving Block Group

ZKYZ-630II-W3700 Self-resetting universal transfer switch

ZKYZ-630II-W4000 Fuse Holder

BYT204-3/4.00 oil drainage vent assy

FY50-08.00 Lateral Block Group II

ZKYZ630II-W1100 One-way valve

ZKYZ630II-W1500 Liquid level gauge

ZKYZ-630II.90.00 Electric control cabinet assembly

Thermal relay JRS4-09306D/Z

FY50-03.00 Lateral Block Group I

Intelligent temperature controller DY-2000

High pressure hose assembly A51I-500

ZKYZ-630II-W3900 Explosion-proof indicator light

ZKYZ-630II.13 adapter G1 1/2 φ42

FY50-09.00 Suspending Assy

High pressure hose assembly 25I-3500

ZKYZ630II-W0700 Overflow valve

ZKYZ-630II-W4300 fuse core 6A

ZKYZ-630I-03.00 oil discharge pipe assembly

ZKYZ-630II-W3500 Four-pole explosion-proof plug/seat

ZKYZ-630II-W2900 Thermal relay 34-50A

GB278-82 Bearing 60307 Gear Reducer

BYT201-80.4A.01 Oil pump motor seat

ZKYZ630II-W0500 Shaft coupling

Cooler LQ-33

ZKYZ-630II-W3800 Positioning Universal Transfer Switch

BYT214-03 Oil suction pipe assembly

ZKYZ630II-W0900 Cut-off valve

FY50-00 General Assembly of BOP Handling System

ZHYZ1000-01 adaoter

Star delta starter QJX4-50D

ZKYZ-630II-W4400 fuse core 3A

Check valve S15A1/2

ZKYZ-630II-W4400 fuse core 3AZKYZ630II-W0800 Pressure gauge

BYT207-3/4.00 Oil drain port assembly

ZKYZ630II-W1200 Oil suction filter

Explosion Proof Knob Switch 8036/B

BYT214-03 Oil suction pipe assy

ZKYZ-630II-W2500 Three-pole circuit breaker

GB276-82 Bearing 106 Pipe hanqer

ZKYZ630II Oil pump motor assy

ZKYZ-630II.17.00 Pipe frame assembly

ZKYZ630II-W1600 liquid level relay

ZKYZ-630I.03.00 oil drainage pipe

 

3. Verified On-site Oilfield Maintenance Cases (4 Cases)

Case 1

Location: Sulige Explosive Drilling BOP Yard; Matched Device: FY50 Full BOP Handling System; Working Load: 235kN cyclic hoisting load; Fault Data: Mismatched lateral block caused BOP lateral offset 0.41mm; Repair Scheme: Install FY50-03.00 Lateral Block Group I + FY50-08.00 Lateral Block Group II; Post-repair Index: BOP lateral offset controlled below 0.10mm, stable positioning achieved; Client Feedback: Eliminated hoisting structural torsion, reduced assembly bolt fatigue loss.

Case 2

Location: Yumen Saline-Alkali BOP Hydraulic Station; Matched Device: ZKYZ-630II Hydraulic Control Loop; Working Load: 28MPa steady hydraulic pressure; Fault Data: Aging overflow valve caused system pressure overrun alarm; Repair Scheme: Replace ZKYZ630II-W0700 overflow valve + S15A1/2 check valve; Post-repair Index: System pressure fluctuation limited within 0.18MPa, effective pressure unloading realized; Client Feedback: Protected plunger pump and hose assembly from high-pressure impact damage.

Case 3

Location: Tarim Low-temperature Desert BOP Base; Matched Device: ZKYZ630II Oil Pump Power Unit; Working Load: 220kN hydraulic output load; Fault Data: Low oil temperature caused motor startup overload tripping; Repair Scheme: Equip QJX4-50D star delta starter + SZY2-22/3 explosion-proof tubular heater; Post-repair Index: Motor startup current stabilized, zero cold-start overload fault; Client Feedback: Adapted desert winter low-temperature startup working condition perfectly.

Case 4

Location: Ningxia Onshore BOP Overhaul Workshop; Matched Device: ZKYZ630II Hydraulic Transmission Unit; Working Load: 210kN continuous transmission load; Fault Data: Worn coupling caused motor radial vibration noise; Repair Scheme: Install NL2YA19X40/YA20X40 coupling + BYT201-80.4A.01 oil pump motor seat; Post-repair Index: Motor vibration amplitude reduced to 0.12mm, buffer transmission smooth; Client Feedback: Solved vibration-induced pipeline joint loosening and oil leakage fault.

4. User Intent Targeted FAQ Table

Serial Number

Common Procurement & On-site Operation Question

Professional Field Engineer Practical Answer

1

Can ZKYZ630I and ZKYZ630II drainage pipe assemblies interchange use?

They differ in interface caliber and mounting pitch, only fit matched cabinet model, cannot cross assembly for hydraulic drainage loop.

2

What is the difference between self-resetting and positioning transfer switch?

Self-resetting switch automatically rebounds after signal action; positioning switch keeps gear state for long-term manual gear locking control.

3

Is NL2YA coupling dedicated for ZKYZ oil pump motor assembly?

It adopts customized double-end shaft hole size, exclusive damping design for FY50 matched oil pump transmission structure.

4

Which parts belong to priority emergency stocked wearing components?

Priority stock fuse cores, filter elements, high-pressure hose assemblies, transfer switches and explosion-proof sealing accessories.

5

Does DY-2000 temperature controller need parameter reset after replacement?

Factory preset matched hydraulic oil temperature threshold, direct plug-in installation without onsite debugging.

5. Procurement Guidance & Closing Paragraph

This full set of FY50 BOP handling mechanical assemblies, ZKYZ-630II explosion-proof hydraulic electric control components, BY series hydraulic pipeline fittings, NL2YA transmission coupling and oilfield standardized valve bearing parts comply with original FY50 BOP system and ZKYZ control cabinet OEM assembly tolerance standards, attached with ATEX explosion-proof qualification reports, high-pressure hose burst test certificates and complete electromechanical assembly wiring drawings for buyer technical audit, hazardous area warehouse filing and onsite equipment overhaul technical reference. All finished components complete gas corrosion aging test, hydraulic tightness test and electric signal linkage matching test before outbound delivery, conforming to international Zone1 onshore BOP hoisting equipment spare part supply standards. We support single-spec bulk procurement, full FY50 BOP hydraulic-electric overhaul kit combined matching and special-caliber high-pressure hose customized processing services. Professional explosion-proof hydraulic-electrical engineering team provides host model matching confirmation, onsite hazardous zone fault troubleshooting and customized periodic maintenance scheme guidance for procurement managers and certified field maintenance staff. Connect to confirm onsite explosion-proof working condition matching, combined component selection and full-cycle professional technical support for your BOP handling equipment spare part reserve and system upgrade overhaul projects.

 


Prosperity Petroleum Equipment

Quick Inquiry